Lake County, IL
File #: 20-1108    Version: 1 Name: 2020 ITS PASSAGE Network: Appropriation and Contract Award
Type: resolution Status: Passed
File created: 8/14/2020 In control: Public Works, Planning & Transportation Committee
On agenda: Final action: 9/8/2020
Title: Joint resolution authorizing a contract with H and H Electric Company, Franklin Park, Illinois, in the amount of $178,115.80 for upgrades and expansion of the Intelligent Transportation System (ITS) PASSAGE Network and appropriating $214,000 of 1/4% Sales Tax for Transportation funds.
Attachments: 1. 20-1108 Bid Tabulation - 2020 PASSAGE Network, 2. 20-1108 Vendor Disclosure, H&H Electric Co., 3. 20-1108 Location Map, 2020 ITS PASSAGE Network
Title
Joint resolution authorizing a contract with H and H Electric Company, Franklin Park, Illinois, in the amount of $178,115.80 for upgrades and expansion of the Intelligent Transportation System (ITS) PASSAGE Network and appropriating $214,000 of 1/4% Sales Tax for Transportation funds.

Staff Summary
* This work will include the replacement and upgrade of remote-controlled video systems and video encoders.
* Maintenance of existing traffic signals, traffic control and protection, and the installation of outdoor network cable are also included in this project.
* The added alternative bidding process was used for this letting.
* A total of two bids were received, ranging from $178,115.80 to $246,861 and the lowest responsible bidder is H and H Electric Company, in the amount of $178,115.80.
* This improvement is included in the transportation improvement program with construction beginning in 2020 and continuing into 2021, and designated as Section 20-00268-22-TL.

Body
R E S O L U T I O N

WHEREAS, pursuant to authority granted by this Lake County Board, the County Engineer heretofore called for sealed bids, by publication, for the replacement and upgrade of remote-controlled video systems, video encoders, outdoor network cable, maintenance of existing traffic signals, traffic control and protection; and

WHEREAS, in addition to the base bid work described above, the added alternative bidding process was used for bidders to provide costs for including Alternatives A, B, C and D work, with a total contract award limit of $200,000; and

WHEREAS, added Alternative A consists of Lake County Division of Transportation (LCDOT) intersection improvements; Bonner Road at Old Rand Road and Gilmer Road at Fairfield Road; and

WHEREAS, added Alternative B consists of LCDOT intersection improvements; Big Hollow Road at Frontage Road and Washington Street at Lake Street; and

WHEREAS, added Alternative C consists of LCDOT intersection improvements; Deep Lake Road at G...

Click here for full text