Lake County, IL
File #: 18-0096    Version: 1 Name: Center Street Culvert: Emergency Declaration Appropriation and Contract Ratification
Type: resolution Status: Passed
File created: 1/23/2018 In control: Public Works and Transportation Committee
On agenda: Final action: 2/13/2018
Title: Joint resolution ratifying contracts with Hampton, Lenzini and Renwick, Inc., Elgin, Illinois, in the amount of $26,652 and Lake County Grading, Libertyville, Illinois, in the amount of $777,459.77 for an emergency procurement required to replace the collapsed culvert on Center Street, located east of Illinois Route 83 in Grayslake, appropriating $810,000 of County Bridge Tax funds for these contracts and other associated costs, and designated as Section 17-00189-05-DR.
Attachments: 1. 18-0096 Center Street Culvert Emergency Lake County Grading Contract.pdf, 2. 18-0096 Center Street Culvert HLR Contract.pdf, 3. 18-0096 Center Street Emergency Procurement Memo 7 25 2017 Signed.pdf
Title
Joint resolution ratifying contracts with Hampton, Lenzini and Renwick, Inc., Elgin, Illinois, in the amount of $26,652 and Lake County Grading, Libertyville, Illinois, in the amount of $777,459.77 for an emergency procurement required to replace the collapsed culvert on Center Street, located east of Illinois Route 83 in Grayslake, appropriating $810,000 of County Bridge Tax funds for these contracts and other associated costs, and designated as Section 17-00189-05-DR.

Staff Summary
* On July 15, 2017, the Acting County Engineer declared an emergency for the collapsed culvert on Center Street, located east of Illinois Route 83 in Grayslake, Illinois.
* The culvert collapse was a result of the historic flood event that occurred in July 2017.
* In accordance with Article 6-103 of the Lake County Purchasing Ordinance, the Acting County Engineer of Lake County certified an emergency procurement for contractual construction services.
* The contractors selected to provide emergency contractual construction services is Hampton, Lenzini and Renwick, Inc., Elgin, Illinois, in the amount of $26,652 and Lake County Grading, Libertyville, Illinois, in the amount of $777,459.77.
* This resolution, per Article 6-103 of the Lake County Purchasing Ordinance, ratifies these emergency procurement contracts and appropriates $810,000 of County Bridge Tax funds for these contracts and other associated costs.

Body
R E S O L U T I O N

WHEREAS, Center Street, County Highway 77, is a designated route on the County highway system; and

WHEREAS, the culvert on Center Street, located east of Illinois Route 83 in Grayslake, Illinois, collapsed during a historic flood event causing a safety hazard for the traveling public; and

WHEREAS, on July 25, 2017, in accordance with Article 6-103 of the Lake County Purchasing Ordinance, the Acting County Engineer of Lake County declared that an emergency existed and certified an emergency procurement; and

WHEREAS, contracts with Hampt...

Click here for full text