File #: 17-0516    Version: 1 Name: Grass Lake Road 2018 Retaining Wall Maintenance, Phase II Design Engineering Services: Change Order Number One and Supplemental Appropriation
Type: resolution Status: Passed
File created: 4/26/2017 In control: Public Works and Transportation Committee
On agenda: Final action: 5/9/2017
Title: Joint resolution approving Change Order Number One consisting of an increase of $16,732.10, appropriating a supplemental amount of $20,000 of Matching Tax funds, for the Phase II design engineering services to stabilize an existing sheet piling wall adjacent to the multi-use path on the north side of Grass Lake Road, and designated as Section 16-00059-11-BR.
Attachments: 1. 17-0516 Grass Lake Road 2018 Retaining Wall Supplemental Contract Draft.pdf
Title
Joint resolution approving Change Order Number One consisting of an increase of $16,732.10, appropriating a supplemental amount of $20,000 of Matching Tax funds, for the Phase II design engineering services to stabilize an existing sheet piling wall adjacent to the multi-use path on the north side of Grass Lake Road, and designated as Section 16-00059-11-BR.

Staff Summary
* Grass Lake Road 2018 Retaining Wall Maintenance, Phase II Design Engineering Services: Change Order Number One and Supplemental Appropriation.
* This project includes stabilizing an existing sheet piling wall, adjacent to the multi-use path, on the north side of Grass Lake Road.
* This project is currently under contract with Amec Foster Wheeler Environment and Infrastructure, Inc., Chicago, Illinois, at a cost of $77,844.
* Additional structural and roadway work will be added to the scope of services increasing the cost by $16,732.10.
* Change orders need to be approved by the standing committees for cumulative net increases over 10 percent.
* The County Board, at its meeting of November 8, 2016 approved an appropriation of $90,000 of Matching Tax funds for these services.
* This resolution appropriates a supplemental amount of $20,000 of Matching Tax funds to cover Change Order Number One in the amount of $16,732.10.

Body
R E S O L U T I O N

WHEREAS, this County Board, at its meeting of November 8, 2016 approved an appropriation of $90,000 of Matching Tax funds for the Phase II design engineering services to stabilize an existing sheet piling wall adjacent to the multi-use path on the north side of Grass Lake Road; and

WHEREAS, this project is currently under contract with Amec Foster Wheeler Environment and Infrastructure, Inc., Chicago, Illinois, at a cost of $77,844; and

WHEREAS, additional structural and roadway work will be added to the scope of services increasing the cost from $77,844 to $94,575; and

WHEREAS, a supplemental appropriation of $20,000 of Matching Tax...