Lake County, IL
File #: 17-0148    Version: 1 Name: Fairfield Road Resurfacing Phase II: Consultant Agreement and Appropriation
Type: resolution Status: Passed
File created: 1/31/2017 In control: Public Works and Transportation Committee
On agenda: Final action: 2/14/2017
Title: Joint resolution authorizing an agreement for engineering consultant services with Gewalt Hamilton Associates, Inc., Vernon Hills, Illinois, for Phase II design engineering services for the resurfacing of Fairfield Road, from Lake Villa Township Line south to Illinois Route 134, at a maximum cost of $87,818.38, appropriating $110,000 of Matching Tax funds, and designated as Section 17-00104-09-RS.
Attachments: 1. 17-0148 Fairfield Road Resurfacing Consultant Agreement Draft.pdf
Title
Joint resolution authorizing an agreement for engineering consultant services with Gewalt Hamilton Associates, Inc., Vernon Hills, Illinois, for Phase II design engineering services for the resurfacing of Fairfield Road, from Lake Villa Township Line south to Illinois Route 134, at a maximum cost of $87,818.38, appropriating $110,000 of Matching Tax funds, and designated as Section 17-00104-09-RS.

Staff Summary
* Fairfield Road Resurfacing Phase II: Consultant Agreement and Appropriation.
* Fairfield Road is in need of resurfacing.
* This resurfacing improvement has been identified within the County's pavement management system, and is included in the Highway Improvement Program.
* An engineering consultant firm will be used for the Phase II design engineering for this improvement.
* In accordance with the Local Government Professional Services Selection Act, the recommended firm is Gewalt Hamilton Associates, Inc., Vernon Hills, Illinois.
* This resolution authorizes the execution of a professional services agreement with Gewalt Hamilton Associates, Inc., Vernon Hills, Illinois, at a maximum cost of services described as $87,818.38 and appropriates $110,000 of Matching Tax funds for these services.

Body
R E S O L U T I O N

WHEREAS, Fairfield Road, County Highway 49, is a designated route on the County highway system; and

WHEREAS, it would be beneficial for the safety and welfare of the motoring public if Fairfield Road, from Lake Villa Township Line South to Illinois Route 134, could be improved by resurfacing; and

WHEREAS, it is advisable that a consultant engineering firm be employed to provide Phase II design engineering services for said improvement; and

WHEREAS, Lake County, by and through its Division of Transportation, has selected a professional engineering services firm in accordance with the Local Government Professional Services Selection Act, 50 ILCS 510/1 et. seq.; and

WHEREAS, Gewalt Hamilton Associates, Inc., Vernon Hills, Illino...

Click here for full text