Lake County, IL
File #: 16-0586    Version: 1 Name: Miller Road, at U.S. Route 12, Intersection Improvement: Consultant Agreement and Appropriation
Type: resolution Status: Passed
File created: 6/2/2016 In control: Public Works and Transportation Committee
On agenda: Final action: 6/14/2016
Title: Joint resolution authorizing an agreement with Bollinger, Lach & Associates, Inc., Itasca, Illinois, for Phase II design engineering services for the intersection improvement of Miller Road, at U.S. Route 12, for a maximum cost of services described as $292,165.67, appropriating $355,000 of 1/4% Sales Tax for Transportation funds, and designated as Section 15-00118-12-CH.
Attachments: 1. 16-0586 Miller Road at US 12 Phase II Consultant Agreement Draft.pdf
Title
Joint resolution authorizing an agreement with Bollinger, Lach & Associates, Inc., Itasca, Illinois, for Phase II design engineering services for the intersection improvement of Miller Road, at U.S. Route 12, for a maximum cost of services described as $292,165.67, appropriating $355,000 of 1/4% Sales Tax for Transportation funds, and designated as Section 15-00118-12-CH.

Staff Summary
* Miller Road, at U,S, Route 12, Intersection Improvement: Consultant Agreement and Appropriation.
* Miller Road, at the intersection of U.S. Route 12, will be improved by adding left turn lanes and traffic signal modifications.
* A consulting engineering firm will be employed to provide Phase II design engineering services.
* Using the Local Government Professional Services Selection Act, the selected, and recommended, consultant is Bollinger, Lach & Associates, Inc., Itasca, Illinois, at a maximum cost of services of $292,165.67.
* This resolution authorizes an agreement with Bollinger, Lach & Associates, Inc., Itasca, Illinois, and appropriates $355,000 of 1/4% Sales Tax for Transportation funds for these engineering services.

Body
R E S O L U T I O N

WHEREAS, Miller Road, County Highway 2, is a designated route on the County highway system; and

WHEREAS, it would be beneficial to the safety and welfare of the motoring public if Miller Road, at U.S. Route 12, could be improved by adding left turn lanes and traffic signal modifications; and

WHEREAS, it is recommended that a consulting engineering firm be employed to provide Phase II design engineering services; and

WHEREAS, Lake County, by and through its Division of Transportation, has selected a professional engineering services firm in accordance with the Local Government Professional Services Selection Act (50 ILCS 510/1 et. seq.); and

WHEREAS, Bollinger, Lach & Associates, Inc., Itasca, Illinois, are consulting engineers skilled in the provision of said Phase II design engineering servic...

Click here for full text