File #: 16-0555    Version: 1 Name: 2016 Stormwater Detention Basin Retrofits: Contract Award
Type: resolution Status: Passed
File created: 5/31/2016 In control: Public Works and Transportation Committee
On agenda: Final action: 6/14/2016
Title: Joint resolution authorizing a contract with Campanella & Sons, Inc., Wadsworth, Illinois, in the amount of $210,492.46, for the modifications of existing stormwater detention basins to improve functionality and water quality, and designated as Section 15-00999-10-DR.
Attachments: 1. 16-0555 Bid Tab, Detention Basin Retrofits.pdf
Title
Joint resolution authorizing a contract with Campanella & Sons, Inc., Wadsworth, Illinois, in the amount of $210,492.46, for the modifications of existing stormwater detention basins to improve functionality and water quality, and designated as Section 15-00999-10-DR.

Staff Summary
* 2016 Stormwater Detention Basin Retrofits: Contract Award.
* Lake County Division of Transportation proposes to retrofit certain stormwater detention basins with improved design features and best management practices to improve stormwater management and water quality treatment.
* One bid was received, and the lowest responsible bidder is Campanella & Sons, Inc., Wadsworth, Illinois, in the amount of $210,492.46.

Body
R E S O L U T I O N

WHEREAS, pursuant to authority granted by this Lake County Board, the County Engineer heretofore called for sealed bids, by publication, for 2016 stormwater detention basin retrofits, and designated as Section 15-00999-10-DR; and

WHEREAS, pursuant to said publication and calling for said bids, sealed bids were received and opened on May 17, 2016, at 10:00 AM at the Lake County Division of Transportation in Libertyville, Illinois; a tabulation of said bids being as follows:

Campanella & Sons, Inc.
Wadsworth, Illinois
$210,492.46

WHEREAS, the Public Works and Transportation Committee, the County Engineer and the Purchasing Agent have examined each bid, and it appears that the lowest responsible bidder is Campanella & Sons, Inc., Wadsworth, Illinois, their bid being $210,492.46 based on estimated quantities and unit prices; and

WHEREAS, this Lake County Board by prior resolution at its meeting of April 12, 2016, appropriated $280,000 of County Bridge Tax funds for the stormwater detention basin retrofits, and designated as Section 15-00999-10-DR; and

NOW, THEREFORE BE IT RESOLVED by this Lake County Board that a contract be awarded to said Campanella & Sons, Inc., Wadsworth, Illinois, in accordance with their bid...