Lake County, IL
File #: 14-0322    Version: 1 Name: Ela Road Non-Motorized Facility at US Route 12 Phase II: Consultant Agreement and Appropriation
Type: resolution Status: Passed
File created: 3/26/2014 In control: Public Works and Transportation Committee
On agenda: Final action: 4/8/2014
Title: Joint resolution executing a contract with GRAEF-USA, Chicago, Illinois for Phase II design engineering services for the inclusion of a municipal sidewalk as part of the Ela Road at US Route 12 intersection improvement at a maximum cost of services described as $24,972.52, appropriating $30,000 of Matching Tax funds, and designated as Section 14-00144-18-CH.
Attachments: 1. 14-0322 Ela Road at Rand Road Consultant Agreement Draft
Title
Joint resolution executing a contract with GRAEF-USA, Chicago, Illinois for Phase II design engineering services for the inclusion of a municipal sidewalk as part of the Ela Road at US Route 12 intersection improvement at a maximum cost of services described as $24,972.52, appropriating $30,000 of Matching Tax funds, and designated as Section 14-00144-18-CH.

Staff Summary
* Ela Road Non-Motorized Facility at US Route 12 Phase II: Consultant Agreement and Appropriation.
* The intersection of Ela Road at US Route 12 will be improved with right turn lanes as part of the improvement being designed for the Village of Lake Zurich's Congestion Mitigation and Air Quality (CMAQ) project.
* The 2010 Non-Motorized Travel Study included a Gap Analysis that identified areas along Ela Road, County Highway 60, with gaps in non-motorized facilities.
* This project is for the design of a municipal sidewalk on the west side of Ela Road, from US Route 12 south, approximately 200 feet, to the existing sidewalk; and on the east side of Ela Road, from US Route 12 north to the existing sidewalk at Terrace Lane.
* A consulting engineering firm will be used for the Phase II design engineering for this improvement.
* In accordance with the Local Government Professional Services Selection Act, the recommended firm is GRAEF-USA, Chicago, Illinois.
* This resolution authorizes the execution of a professional services agreement with GRAEF-USA, Chicago, Illinois at a maximum cost of services described as $24,972.52, for Phase II design engineering services and appropriates $30,000 of Matching Tax funds.

Body
R E S O L U T I O N

WHEREAS, Ela Road, County Highway 60, is a designated route on the County highway system; and

WHEREAS, In 2000 the Village of Lake Zurich (Village) received approval to utilize federal Congestion Mitigation and Air Quality (CMAQ) funding for the addition of right turn lanes at the intersection of US Route 12 at Ela Road; and

WHEREAS, t...

Click here for full text