Lake County, IL
Meeting Name: Public Works and Transportation Committee Agenda status: Final
Meeting date/time: 5/4/2016 8:30 AM Minutes status: Final  
Meeting location: Assembly Room, 10th Floor
Published agenda: Agenda Agenda Published minutes: Minutes Minutes Meeting Extra1: Not available  
Meeting video:  
Attachments:
File #Ver.Agenda #NameTypeTitleActionResultAction DetailsVideo
16-0435  1.Presentation on construction activities at the Northwest Regional Excess Flow FacilitypresentationPresentation on construction activities at the Northwest Regional Excess Flow Facility.   Roll call Not available
16-0432 17.1Joint resolution authorizing the execution of a contract with Chicgoland Paving Contractors, Inc. of Lake Zurich, IL for the Asphalt Patching and Seal Coating - Shared Services Project in the amount of $176,000.resolutionJoint resolution authorizing a contract with Chicagoland Paving Contractors, Inc. of Lake Zurich, Illinois, for the asphalt patching and seal coating shared services project, in the amount of $176,000.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
16-0433 17.2Joint resolution authorizing execution of a professional services agreement with Greengard, Inc. of Lincolnshire, IL in the amount of $153,500 for engineering services for the Fox Lake Hills Water System Improvement Project.resolutionJoint resolution authorizing a professional services agreement with Greengard, Inc., Lincolnshire, Illinois, in the amount of $153,500 for engineering services for the Fox Lake Hills Water System Improvement Project.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
16-0435 17.3Presentation on construction activities at the Northwest Regional Excess Flow FacilitypresentationPresentation on construction activities at the Northwest Regional Excess Flow Facility.presented  Action details Not available
16-0040 17.4Director’s Report – Public WorksdiscussionDirector’s Report - Public Works.   Action details Not available
16-0410 17.5County Speed Zone Ordinance: Peterson Road, From Illinois Route 60 to Alleghany Road, In Fremont TownshipordinanceOrdinance providing for the establishment of an altered speed zone of 45 miles per hour (M.P.H), currently posted as 50 M.P.H., on Peterson Road, County Highway 20, from Illinois Route 60, to a point 1,320 feet west of Alleghany Road, County Highway 39, located in Fremont Township, in conformity with Chapter 625 - Section 5/11-604 of the Illinois Compiled Statutes.recommended for adoption to the consent agendaPass Action details Not available
16-0351 17.6County Speed Zone Ordinance: Peterson Road, From Illinois Route 83 to Alleghany Road, In Fremont TownshipordinanceOrdinance providing for the establishment of an altered speed zone of 45 miles per hour (M.P.H.), currently posted as 55 M.P.H on Peterson Road, County Highway 20, from Illinois Route 83, Ivanhoe Road, to a point 1,320 feet east of Alleghany Road, County Highway 39, located in Fremont Township, in conformity with Chapter 625 - Section 5/11-604 of the Illinois Compiled Statutes.recommended for adoption to the consent agendaPass Action details Not available
16-0429 17.72016 Traffic Signal - Emergency Vehicle Preemption Installation: AppropriationresolutionJoint resolution appropriating $120,000 of ¼% Sales Tax for Transportation funds for the installation of emergency vehicle preemption (EVP) equipment at various traffic signal locations on the County highway system, and designated as Section 16-00999-23-TL.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
16-0430 17.8Wadsworth Road: Village of Beach Park AgreementresolutionJoint resolution authorizing an agreement with the Village of Beach Park to provide routine maintenance for the roadway improvement of Wadsworth Road, west of Sheridan Road, and designated as Section 15-00999-18-RS.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
16-0387 17.9Kenosha Road and 21st Street Resurfacing: Contract AwardresolutionJoint resolution authorizing a contract with Peter Baker & Son Company, Lake Bluff, Illinois, in the amount of $1,701,701, for the resurfacing of Kenosha Road from 21st Street to Illinois Route 131, the resurfacing of 21st Street from Illinois Route 131 to Kenosha Road, and for enhancing the median on Wadsworth Road at Sheridan Road, and designated as Section 15-00999-18-RS.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
16-0028 17.10Director's Report - 2016communication or reportDirector’s Report - Transportation.   Action details Not available