Lake County, IL
Meeting Name: Public Works and Transportation Committee Agenda status: Final
Meeting date/time: 5/1/2013 8:30 AM Minutes status: Final  
Meeting location: Assembly Room, 10th Floor
Published agenda: Agenda Agenda Published minutes: Minutes Minutes Meeting Extra1: Not available  
Meeting video:  
Attachments:
File #Ver.Agenda #NameTypeTitleActionResultAction DetailsVideo
13-0480 13.1Minutes from April 3, 2013.minutesMinutes from April 3, 2013.approval of minutesPass Action details Not available
13-0491 17.1SFY 2014 Chicago Metropolitan Agency for Planning (CMAP) PL AgreementresolutionJoint resolution providing for the receipt of the State Fiscal Year (SFY) 2014 reimbursement from the Chicago Metropolitan Agency for Planning (CMAP) to the Lake County Division of Transportation (LCDOT) of federal highway planning assistance funds that flow through the Illinois Department of Transportation (IDOT).approved and referred on to the Financial and Administrative CommitteePass Action details Not available
13-0496 17.2Washington Street, from Cedar Lake Road to Hainesville Road: Village of Round Lake Park AgreementresolutionJoint resolution authorizing an agreement with the Village of Round Lake Park for the construction of a sidewalk along Washington Street, from Cedar Lake Road to Hainesville Road, and the relocation of Village watermain facilities located within the project limits, and designated as Section 05-00121-07-WR.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
13-0389 17.3Miller Road Improvement: Village of North Barrington Agreement and AppropriationresolutionJoint resolution authorizing an agreement with the Village of North Barrington for compensatory flood storage and temporary easements for the Miller Road improvement, appropriating $150,000 of County Bridge Tax funds, and designated as Section 08-00118-09-BR.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
13-0486 17.4Miller Road Bridge: Contract AwardresolutionJoint resolution awarding a contract for the improvement of Miller Road, from Glen Circle Drive to Biltmore Drive, to the lowest responsible bidder Curran Contracting Company, Crystal Lake, Illinois, in the amount of $2,382,627.56 and designated as Section 08-00118-09-BR.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
13-0484 17.5Fairfield Road Reconstruction, North of Grand Avenue to South of Petite Lake Road: Contract AwardresolutionJoint resolution awarding a contract for the reconstruction of Fairfield Road, from north of Grand Avenue to south of Petite Lake Road, to the lowest responsible bidder Berger Excavating Contractors, Wauconda, Illinois, in the amount of $862,062.89 and designated as Section 00-00180-01-RS.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
13-0487 17.62013 Warren Township Road District: Contract AwardresolutionJoint resolution authorizing a contract for bituminous pavement removal, patching, resurfacing, and concrete curb and gutter removal on various roads in the Warren Township Road District, and designated as Section 13-14131-03-GM, to Peter Baker & Son Company, Lake Bluff, Illinois, in the amount of $218,913.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
13-0492 17.7Wadsworth Road at Green Bay Road Intersection Improvement, Phase II Design Engineering Services: Change Order No. 2committee action itemJoint committee action item approving Change Order No. 2, consisting of an increase of $19,864.17 for additions to the Wadsworth Road at Green Bay Road intersection improvement phase II design engineering services contract, and designated as Section 03-00033-12-CH.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
13-0489 17.8Presentation and Overview: Preservation Projects for the 5-Year Plancommunication or reportPresentation and overview of Preservation Projects for the 5-Year Plan.   Action details Not available
13-0490 17.9Director's Report - Transportationcommunication or reportDirector’s Report - Transportation.   Action details Not available
13-0498 19.1Presentation on the draft 2014 budget policies.presentationPresentation on the draft 2014 budget policies.   Action details Not available