Skip to main content
Lake County, IL
Meeting Name: Public Works and Transportation Committee Agenda status: Final
Meeting date/time: 1/7/2015 8:30 AM Minutes status: Final  
Meeting location: Assembly Room, 10th Floor
Published agenda: Agenda Agenda Published minutes: Minutes Minutes Meeting Extra1: Not available  
Meeting video:  
Attachments:
File #Ver.Agenda #NameTypeTitleActionResultAction DetailsVideo
14-1291 13.1PWT 9.3.14 Minutescommittee action itemMinutes from September 3, 2014.approvedPass Action details Not available
14-1294 13.2PWT 10.8.14 Minutescommittee action itemMinutes from October 8, 2014.approvedPass Action details Not available
14-1279 17.1Intelligent Transportation System (ITS) PASSAGE Field Elements 2014: Contract AwardresolutionJoint resolution authorizing a contract with Meade Electric Co., Inc., McCook, Illinois, in the amount of $421,704.44 for traffic signal interconnects to Lake County PASSAGE, along various routes in Lake County, and designated as Section 14-00268-13-TL.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
14-1280 17.2Guardrail and Fence Maintenance 2015: AppropriationresolutionJoint resolution appropriating $60,000 of Motor Fuel Tax funds for the 2015 repair and replacement of various guardrail and fence installations, and designated as Section 15-00000-06-GM.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
14-1313 17.3Buffalo Grove Road, Illinois Route 22 to Deerfield Parkway. Phase II: Consultant Agreement and AppropriationresolutionJoint resolution authorizing the execution of an agreement for consulting engineering services with Gewalt Hamilton Associates, Inc., Vernon Hills, Illinois, for Phase II design engineering services for the reconstruction and widening of Buffalo Grove Road, from Illinois Route 22 to Deerfield Parkway, at a maximum cost of $1,197,363.11, appropriating $1,440,000 of ¼% Sales Tax for Transportation funds, and designated as Section 11-00249-03-WR.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
14-1281 17.4Winchester Road Compensatory Floodplain Storage: LCDOT Change Order No. 2committee action itemJoint committee action item approving Change Order No. 2, for additions to the Winchester Road Compensatory Floodplain Storage construction contract, which is an increase of $9,361.35, and designated as Section No. 10-00151-22-CH.approvedPass Action details Not available
14-1314 17.5Washington Street, Atkinson Road to Lancer Lane, Bike Path Extension, Construction: Supplemental AppropriationresolutionJoint resolution authorizing a supplemental appropriation of $230,000 of Motor Fuel Tax Funds for the construction of the Washington Street Bike Path extension, from Atkinson Road to Lancer Lane, and designated as Section 09-00135-11-BT.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
14-0064 17.6Director's Report - Transportationcommunication or reportDirector’s Report - Transportation.   Action details Not available
14-1255 27.7Fifth Amendment to sewage disposal with Grayslake - SAIAresolutionJoint resolution authorizing the execution of the Fifth Amendment to Restated and Amended Agreement for Sewage Disposal with the Village of Grayslake.recommended for adoption to the regular agendaPass Action details Not available
14-1285 17.8Joint Resolution authorizing a contract with Wunderlich-Malec Services, Inc. of Minnetonkas, MN for the SCADA Improvements Phase II Project in the amount of $1,146,751.resolutionJoint resolution executing a contract with Wunderlich-Malec Services, Inc. of Minnetonka, Minnesota, in the amount of $1,146,751 for the SCADA Improvements Phase II Project.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
14-1287 17.9Joint Resolution authorizing execution of a professional services agreement with RJN Group, Inc. in the amount of $135,174 for engineering services for the 2015 Infiltration and Inflow Reduction Program.resolutionJoint resolution authorizing execution of a professional services agreement with RJN Group, Inc., Wheaton, Illinois, in the amount of $135,174 for engineering services for the 2015 Infiltration and Inflow Reduction Program.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
14-1286 17.10Joint Resolution authorizing County execution of documents necessary to secure an IEPA Low Interest Loan for financing of the Des Plaines River Water Reclamation Facility (DPR WRF) Phases 2 and 3 Improvement ProjectresolutionJoint resolution authorizing County execution of documents necessary to secure an Illinois Environmental Protection Agency (IEPA) low interest loan for financing of the Des Plaines River Water Reclamation Facility Phases 2 and 3 Improvement Project.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
12-1231 17.11Director’s Report – Public WorksdiscussionDirector’s Report - Public Works.received and placed on the consent agenda  Action details Not available
14-1325 1 SWALCO electronic recycling program discussiondiscussionDiscussion regarding Solid Waste Agency of Lake County’s (SWALCO’s) electronic recycling program.   Action details Not available
14-1317 19.1Demonstration of the draft on-line code of Ordinances.presentationDemonstration of the draft on-line Code of Ordinances.   Action details Not available