Lake County, IL
Meeting Name: Public Works and Transportation Committee Agenda status: Final
Meeting date/time: 2/26/2014 8:30 AM Minutes status: Final  
Meeting location: Assembly Room, 10th Floor
Published agenda: Not available Published minutes: Minutes Minutes Meeting Extra1: Not available  
Meeting video:  
Attachments:
File #Ver.Agenda #NameTypeTitleActionResultAction DetailsVideo
14-0207 13.1Minutes from February 5, 2014.minutesMinutes from February 5, 2014.approval of minutesPass Action details Not available
14-0182 17.1Washington St Improvements Hainesville to Lake with DOT Letter of IntentresolutionJoint resolution executing a Letter of Intent and Concurrence related to the Washington Street Improvement Project.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
14-0184 17.2Approval of CMOM Program for Northwest Facility Planning Area NWFPAresolutionJoint resolution adopting the Capacity Management Operations and Maintenance (CMOM) Program for the Northwest Lake Facilities Planning Area (NWFPA).approved and referred on to the Financial and Administrative CommitteePass Action details Not available
14-0189 17.3Contract with JJ Henderson construction Vernon Hills NCT WRF Blower Addition and Aeration Project and authorization of emergency appropriation FY2014resolutionJoint resolution authorizing a contract with Joseph J. Henderson & Son, Gurnee, Illinois in the amount of $2,202,000 for the construction of the Vernon Hills New Century Town (NCT) Water Reclamation Facility (WRF) Blower Addition and Aeration Upgrade Project and authorizing an emergency appropriation in the amount of $1,750,000 to Fiscal Year 2014 Budget.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
14-0191 17.4Agreement with Clark Dietz for engineering services for Vernon Hills NCT Water Reclamation Facility WRF Blower Addition and Aeration authorizationresolutionJoint resolution executing a professional services agreement with Clark Dietz, Inc., Kenosha, Wisconsin in the amount of $73,665 for engineering services for the Vernon Hills New Century Town (NCT) Water Reclamation Facility (WRF) Blower Addition and Aeration Upgrades Project.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
14-0188 17.5Report on Des Plaines River DPR Watershed Workgroupcommunication or reportCommittee report on the Des Plaines River Watershed Workgroup.received and placed on the consent agendaPass Action details Not available
14-0183 17.6Committee report on Sewer/Water Rate Studycommunication or reportPresentation on the sewer and water rate study.   Action details Not available
12-12311 17.7Director’s Report - Public Workscommunication or reportDirector’s Report - Public Works.   Action details Not available
14-0157 17.8Fairfield Road Resurfacing: Contract AwardresolutionJoint resolution authorizing a contract for the resurfacing of Fairfield Road, from Illinois Route 60 to 1,100 feet north of Gossell Road, to Peter Baker & Son Company, Lake Bluff, Illinois, in the amount of $1,107,764.63, and designated as Section 13-00113-18-RS.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
14-0158 17.9Non-Motorized Travel Improvements 2013 - Hunt Club Road: Contact AwardresolutionJoint resolution authorizing a contract for non-motorized travel improvements in certain areas along Hunt Club Road to Alliance Contractors, Woodstock, Illinois, in the amount of $128,954.52, and designated as Section 13-00095-16-SW.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
14-0159 17.10O’Plaine Road Resurfacing: Contract AwardresolutionJoint resolution authorizing a contract for the resurfacing of O’Plaine Road, from Washington Street to Illinois Route 137, to J.A. Johnson Paving Company, Arlington Heights, Illinois, in the amount of $2,119,783.64, and designated as Section 13-00109-08-RS.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
14-0160 17.11Peterson Road Widening: Contract AwardresolutionJoint resolution authorizing a contract for the construction improvement of Peterson Road, from Illinois Route 83 to Franklin Boulevard, to Berger Excavating, Wauconda, Illinois, in the amount of $10,833,869.69, and designated as Section 07-00098-17-WR.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
14-0161 17.12Washington Street Resurfacing: Contract AwardresolutionJoint resolution authorizing a contract for the resurfacing of Washington Street, from the Union Pacific Railroad Bridge to Illinois Route 131, to Peter Baker & Son Company, Lake Bluff, Illinois, in the amount of $1,065,077.81, and designated as Section 13-00220-07-RS.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
14-0162 17.13Washington Street Drain Tile Repairs: Contract AwardresolutionJoint resolution authorizing a contract for the repair of drain tile on the south side of Washington Street, east of Illinois Route 83, to Campanella & Sons, Wadsworth, Illinois, in the amount of $66,932.97, and designated as Section 13-00135-12-DR.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
14-0163 17.14Winchester Road Left Turn Lane & Railroad Crossing: Contract AwardresolutionJoint resolution authorizing a contract for the Winchester Road improvement, to Berger Excavating, Wauconda, Illinois, in the amount of $1,123,456.05, and designated as Section 10-00151-22-CH.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
14-0166 17.152013-2014 Winter Season Ice Control Salt: Supplemental AppropriationresolutionJoint resolution appropriating a supplemental amount of $1,000,000 of Motor Fuel Tax funds for ice control salt materials needed for the 2013-2014 winter season, and designated as Section 14-00000-00-GM.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
14-0171 17.162014-2015 Winter Season Ice Control Salt: AppropriationresolutionJoint resolution appropriating $1,445,000 of Motor Fuel Tax funds for ice control salt materials needed for the 2014-2015 winter season, and designated as Section 15-00000-00-GM.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
14-0167 17.172014 Stormwater Detention Basin Retrofits: AppropriationresolutionJoint resolution appropriating $240,000 of County Bridge Tax funds for the modifications of older existing stormwater detention basins to improve functionality and water quality, and designated as Section 13-00999-44-DR.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
14-0168 17.182014 Bituminous Maintenance: AppropriationresolutionJoint resolution appropriating $960,000 of Motor Fuel Tax funds for annual bituminous maintenance of various roads and bike paths on the County highway system, and designated as Section 14-00000-13-GM.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
14-0169 17.192014 Concrete Pavement Patching: AppropriationresolutionJoint resolution appropriating $420,000 of Motor Fuel Tax funds for concrete pavement patching, where necessary, on various County highways, and designated as Section 14-00000-10-GM.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
14-0170 17.202014 Crack Sealing: AppropriationresolutionJoint resolution appropriating $90,000 of Matching Tax funds to provide for crack sealing of bituminous and concrete pavement, where necessary, on various County highways, and designated as Section 14-00000-04-GM.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
14-0175 17.21Weiland Road, from Lake Cook Road to Illinois Route 22; Phase II Consultant Agreement and AppropriationresolutionJoint resolution authorizing the execution of a contract with Civiltech Engineering Inc., Itasca, Illinois, for professional services for Phase II design engineering services for the reconstruction and widening of Weiland Road, from Lake Cook Road to Illinois Route 22, at a maximum cost of $3,371,012.93, appropriating $4,050,000 of ¼% Sales Tax for Transportation and Public Safety funds for this improvement, and designated as Section 14-00158-11-WR.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
14-0176 17.22FY 2014 LCDOT Capital and Bond Funds: Emergency AppropriationresolutionJoint resolution authorizing emergency appropriations in FY 2014 Lake County Division of Transportation (LCDOT) capital and bond funds for projects previously approved and for additional revenue.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
14-0177 17.232014 PASSAGE Field Elements Design: Consultant Agreement and AppropriationresolutionJoint resolution authorizing an agreement with DLZ Illinois, Chicago, Illinois, for Phase II design engineering services for traffic signal interconnects to Lake County PASSAGE, along various routes in Lake County, at a maximum cost of $45,169.87, appropriating $55,000 of ¼% Sales Tax for Transportation and Public Safety funds, and designated as Section 14-00268-13-TL.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
14-0178 17.24Peterson Road Reconstruction Consultant Agreement and AppropriationresolutionJoint resolution authorizing an agreement with Christopher B. Burke Engineering, Rosemont, Illinois, for the provision of Phase II design engineering services for the proposed Peterson Road widening, west of Illinois Route 83 to west of Alleghany Road, and the Alleghany Road resurfacing, north of Peterson Road to south of Illinois 120, at a maximum cost of services described as $892,067.74, appropriating $1,075,000 of ¼% Sales Tax for Transportation and Public Safety funds for these engineering services, and designated as Section 10-00098-19-RP.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
14-0179 17.25Fremont Center Road Extension Consultant Agreement and AppropriationresolutionJoint resolution authorizing an agreement with Civiltech Engineering Inc., Itasca, Illinois, for the provision of Phase I preliminary engineering services for the proposed Fremont Center Road extension at a maximum cost of services described as $671,758, appropriating $810,000 of ¼% Sales Tax for Transportation and Public Safety funds for these engineering services, and designated as Section 12-00138-02-ES.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
14-0190 17.26North Shore Bike Path at the UPRR Crossing: Agreement and AppropriationresolutionJoint resolution authorizing an agreement with the Union Pacific Railroad (UPRR) for the construction of the North Shore Bike Path at the UPRR crossing and appropriating $430,000 of Matching Tax funds for the construction, and designated as Section 10-00252-02-BT.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
14-0164 17.27Adopt-A-Highway Program; Spring 2014 Application Cycle: Approvalcommittee action itemCommittee action approving the Spring 2014 Adopt-A-Highway Program.approvedPass Action details Not available
14-0165 17.28Presentation and Overview: Preview of 2013-2014 Large Projects for the 5-Year Plancommunication or reportPresentation and preview of 2013-2014 large projects for the 5-Year Plan.   Action details Not available
14-0064 17.29Director's Report - Transportationcommunication or reportDirector’s Report - Transportation.   Action details Not available