Lake County, IL
Meeting Name: Public Works, Planning & Transportation Committee (inactive) Agenda status: Final
Meeting date/time: 7/29/2020 8:30 AM Minutes status: Final  
Meeting location: Live-streamed at: http://lakecounty.tv/, Comcast Ch. 18 or 30, AT&T U-Verse Ch. 99, & 18 N County St, Waukegan (10th Floor)
Published agenda: Agenda Agenda Published minutes: Minutes Minutes Meeting Extra1: Not available  
Meeting video:  
Attachments:
File #Ver.Agenda #NameTypeTitleActionResultAction DetailsVideo
20-0824 10Determination of need for meetings of the Lake County Board and Committees to be held by audio or video conference.presentationDetermination of need for meetings of the Lake County Board and Committees to be held by audio or video conference.   Action details Not available
20-1001 17.1Minutes for July 8, 2020.minutesMinutes for July 8, 2020.approval of minutesPass Action details Not available
20-0970 17.2Sign Inventory System Maintenance: AppropriationresolutionJoint resolution appropriating $29,100 ($9,700 annually) of Matching Tax funds for three years of maintenance service for the Lake County Division of Transportation Sign Inventory System.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
20-0973 17.32021 Patrol 1 General Maintenance Materials and Services: AppropriationresolutionJoint resolution appropriating $782,900 of Motor Fuel Tax funds for maintaining streets and highways, including utility services, under the applicable Illinois Highway Code, from December 1, 2020, to November 30, 2021, and $200,000 of Matching Tax funds for de-icing materials.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
20-0971 17.4Washington Street Resurfacing: Phase II Consultant Agreement and AppropriationresolutionJoint resolution authorizing an agreement with Gewalt Hamilton Associates, Inc., Vernon Hills, Illinois, for Phase II design engineering services for the resurfacing of Washington Street, from Lake Street to US Route 45, at a maximum cost of $182,205, and appropriating $220,000 of Motor Fuel Tax funds.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
20-0972 17.5Fairfield Road and Monaville Road: Lake Villa Township Road District AgreementresolutionResolution authorizing an agreement with the Lake Villa Township Road District for the intersection improvements at Fairfield Road and Monaville Road, including the partial vacation of Old Monaville Road.recommended for adoption to the consent agendaPass Action details Not available
20-0003 17.6Director's Reportcommunication or reportDirector’s Report - Transportation.   Action details Not available
20-0993 17.7Resolution on ZBA Case No. 000537-2019 for a rezoning of a parcel from the Residential-1 zoning district to the General Commercial zoning district.resolutionResolution on Zoning Board of Appeals (ZBA) Case Number 000537-2019 for a rezoning of a parcel from the Residential-1 zoning district to the General Commercial (GC) zoning district.recommended for adoption to the regular agendaPass Action details Not available
20-0996 17.8Resolution on ZBA Case No. 000536-2019 for a Conditional Use Permit for a Planned Unit Development and PUD Preliminary Development Plan for a self-service storage use (indoor/outdoor).resolutionResolution on Zoning Board of Appeals (ZBA) Case Number 000536-2019 for a Conditional Use Permit (CUP) for a Planned Unit Development (PUD) and PUD Preliminary Development Plan for a self-service storage use (indoor/outdoor).recommended for adoption to the regular agendaPass Action details Not available
20-0995 17.9Planning, Building and Development annual updatepresentationPlanning, Building and Development annual update.presented  Action details Not available
20-0041 17.10Director's Report - Planning Building and Developmentcommunication or reportDirector's Report - Planning, Building and Development.   Action details Not available
20-0990 17.11Joint resolution authorizing execution of a contract with Joel Kennedy Construction Corp., of Chicago, Illinois in the amount of $923,250 for the Midland Force Main Replacement Phase 1A Project.resolutionJoint resolution authorizing a contract with Joel Kennedy Construction Corp., Chicago, Illinois, in the amount of $898,250 for the Midland Force Main Replacement Phase 1A Project.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
20-0992 17.12Placeholder for Director's Report/Emerging Contaminantscommunication or reportDirector’s Report - Public Works on Emerging Contaminants.presented  Action details Not available
19-1494 17.13Stormwater Management Commission annual updatepresentationStormwater Management Commission’s annual update.tabled  Action details Not available