Skip to main content
Lake County, IL
Meeting Name: Public Works and Transportation Committee Agenda status: Final
Meeting date/time: 7/30/2025 8:30 AM Minutes status: Final  
Meeting location: Assembly Room, 10th Floor or register for remote attendance at: https://bit.ly/465Y55O
Published agenda: Agenda Agenda Published minutes: Minutes Minutes Meeting Extra1: Not available  
Meeting video:  
Attachments:
File #Ver.Agenda #NameTypeTitleActionResultAction DetailsVideo
25-0921 18.1Committee action approving the Public Works and Transportation Committee minutes from June 25, 2025.minutesCommittee action approving the Public Works and Transportation Committee minutes from June 25, 2025.approval of minutesPass Action details Not available
25-0900 18.2agreement with Alfa Laval Inc., of Houston, Texas, in the amount of $203,475, to perform critical equipment maintenance/repair and reconditioning of the belt filter press at the County’s Mill Creek Water Reclamation Facility.resolutionJoint resolution authorizing an agreement with Alfa Laval Inc., of Houston, Texas, in the amount of $203,475, to perform critical equipment maintenance/repair and reconditioning of the belt filter press at the County’s Mill Creek Water Reclamation Facility.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
25-0901 18.3engineering services agreement with CDM Smith, Inc. of Chicago, Illinois, in the amount of $73,640 for engineering services for the Pekara Water System Corrosion Control Evaluation Desktop Study.resolutionJoint resolution authorizing execution of an engineering services agreement with CDM Smith, Inc. of Chicago, Illinois, in the amount of $73,640 for engineering services for the Pekara Water System Corrosion Control Evaluation Desktop Study.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
25-0902 18.4contract with Bolder Contractors, Inc., of Cary, Illinois, in the amount of $7,020,250 for the Vernon Hills West Pump Station Force Main Replacement Project and an emergency appropriation of $7,020,250 of Public Works reserve fundsresolutionJoint resolution authorizing execution of a contract with Bolder Contractors, Inc., of Cary, Illinois, in the amount of $7,020,250 for the Vernon Hills West Pump Station Force Main Replacement Project and an emergency appropriation of $7,020,250 of Public Works reserve funds.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
25-0915 18.5Director's Report - Public Works.communication or reportDirector’s Report - Public Works.   Action details Not available
25-0946 18.6Wadsworth Road (Illinois 131 to Sheridan Road): ROW AppropriationresolutionJoint resolution appropriating $1,600,000 of ¼% Sales Tax for Transportation funds for the acquisition of necessary right-of-way, by agreement or condemnation, and other right-of-way costs associated with the improvements of Wadsworth Road, from Illinois Route 131 to Sheridan Road.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
25-0947 18.7Safety Action Plan PresentationpresentationPresentation of the Safety Action Plan.   Action details Not available
25-0022 18.8Director’s Report – Division of Transportation.communication or reportDirector’s Report - Division of Transportation.   Action details Not available