13-0850
| 1 | 7.1 | Water and sewer rate ordinance | ordinance | Ordinance amending water and sewer related rates for certain Lake County systems. | recommended for adoption to the consent agenda | Pass |
Action details
|
Not available
|
13-0876
| 1 | 7.2 | Committee action endorsing the 5-Year Capital Improvements Plan for the Public Works Department | committee action item | Committee action endorsing the 5-Year Capital Improvements Plan for the Public Works Department. | approved | Pass |
Action details
|
Not available
|
13-0848
| 1 | 7.3 | Report on Sewer Forcemain Replacement on Washington St, Round Lake | communication or report | Report on the sewer forcemain replacement along Washington Street in Round Lake. | | |
Action details
|
Not available
|
12-12311
| 1 | 7.4 | Director’s Report - Public Works | communication or report | Director’s Report - Public Works. | | |
Action details
|
Not available
|
13-0851
| 1 | 7.5 | Peterson Road at IL Route 60 Right-of-Way Acquisition: Supplemental Appropriation | resolution | Joint resolution making a supplemental appropriation of $75,000 of Matching Tax funds for costs associated with the acquisition of necessary right-of-way for recently completed improvements to the intersection of Peterson Road (County Highway 20) and Illinois Route 60, and designated as Section 00-00098-11-CH. | approved and referred on to the Financial and Administrative Committee | Pass |
Action details
|
Not available
|
13-0852
| 1 | 7.6 | LCDOT Building “B” (Heavy Duty Repair Shop) Replacement: Appropriation | resolution | A joint resolution appropriating $2,750,000 of Motor Fuel Tax funds for the replacement of Building “B” (Heavy Duty Repair Shop) at the Lake County Division of Transportation (LCDOT) campus in Libertyville to support highway maintenance operations, and designated as Section 11-00214-22-MG. | approved and referred on to the Financial and Administrative Committee | Pass |
Action details
|
Not available
|
13-0858
| 1 | 7.7 | 2013 Resurfacing of Riverwoods Road, Fairfield Road and O’Plaine Road: Consultant Agreement and Appropriation | resolution | Joint resolution authorizing an agreement for professional engineering services with McClure Engineering Associates, Inc., Waukegan, Illinois, for Phase II design engineering services for the proposed 2013 resurfacing of Riverwoods Road, Fairfield Road, and O’Plaine Road at a maximum cost of services described as $210,009.21, appropriating $250,000 of Matching Tax funds for these engineering services, and designated as Section 13-00999-48-EG. | approved and referred on to the Financial and Administrative Committee | Pass |
Action details
|
Not available
|
13-0863
| 1 | 7.8 | Illinois Route 53/120 Corridor Planning: Intergovernmental Agreement & Appropriation | resolution | Joint resolution authorizing the execution of an intergovernmental agreement with the Chicago Metropolitan Agency for Planning (CMAP) and the Illinois State Toll Highway Authority (Tollway) for the 53/120 Corridor Transportation, Land Use, and Open Space Planning activities in Lake County, appropriating $90,000 of ¼ % Sales Tax for Transportation and Public Safety funds, and designated as Section 13-00000-18-ES. | approved and referred on to the Financial and Administrative Committee | Pass |
Action details
|
Not available
|
13-0490
| 1 | 7.9 | Director's Report - Transportation | communication or report | Director’s Report - Transportation. | | |
Action details
|
Not available
|