Lake County, IL
Meeting Name: Public Works and Transportation Committee Agenda status: Final
Meeting date/time: 8/7/2013 8:30 AM Minutes status: Final  
Meeting location: Assembly Room, 10th Floor
Published agenda: Not available Published minutes: Minutes Minutes Meeting Extra1: Not available  
Meeting video:  
Attachments:
File #Ver.Agenda #NameTypeTitleActionResultAction DetailsVideo
13-0850 17.1Water and sewer rate ordinanceordinanceOrdinance amending water and sewer related rates for certain Lake County systems.recommended for adoption to the consent agendaPass Action details Not available
13-0876 17.2Committee action endorsing the 5-Year Capital Improvements Plan for the Public Works Departmentcommittee action itemCommittee action endorsing the 5-Year Capital Improvements Plan for the Public Works Department.approvedPass Action details Not available
13-0848 17.3Report on Sewer Forcemain Replacement on Washington St, Round Lakecommunication or reportReport on the sewer forcemain replacement along Washington Street in Round Lake.   Action details Not available
12-12311 17.4Director’s Report - Public Workscommunication or reportDirector’s Report - Public Works.   Action details Not available
13-0851 17.5Peterson Road at IL Route 60 Right-of-Way Acquisition: Supplemental AppropriationresolutionJoint resolution making a supplemental appropriation of $75,000 of Matching Tax funds for costs associated with the acquisition of necessary right-of-way for recently completed improvements to the intersection of Peterson Road (County Highway 20) and Illinois Route 60, and designated as Section 00-00098-11-CH.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
13-0852 17.6LCDOT Building “B” (Heavy Duty Repair Shop) Replacement: AppropriationresolutionA joint resolution appropriating $2,750,000 of Motor Fuel Tax funds for the replacement of Building “B” (Heavy Duty Repair Shop) at the Lake County Division of Transportation (LCDOT) campus in Libertyville to support highway maintenance operations, and designated as Section 11-00214-22-MG.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
13-0858 17.72013 Resurfacing of Riverwoods Road, Fairfield Road and O’Plaine Road: Consultant Agreement and AppropriationresolutionJoint resolution authorizing an agreement for professional engineering services with McClure Engineering Associates, Inc., Waukegan, Illinois, for Phase II design engineering services for the proposed 2013 resurfacing of Riverwoods Road, Fairfield Road, and O’Plaine Road at a maximum cost of services described as $210,009.21, appropriating $250,000 of Matching Tax funds for these engineering services, and designated as Section 13-00999-48-EG.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
13-0863 17.8Illinois Route 53/120 Corridor Planning: Intergovernmental Agreement & AppropriationresolutionJoint resolution authorizing the execution of an intergovernmental agreement with the Chicago Metropolitan Agency for Planning (CMAP) and the Illinois State Toll Highway Authority (Tollway) for the 53/120 Corridor Transportation, Land Use, and Open Space Planning activities in Lake County, appropriating $90,000 of ¼ % Sales Tax for Transportation and Public Safety funds, and designated as Section 13-00000-18-ES.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
13-0490 17.9Director's Report - Transportationcommunication or reportDirector’s Report - Transportation.   Action details Not available