Lake County, IL
Meeting Name: Public Works and Transportation Committee Agenda status: Final
Meeting date/time: 3/1/2023 8:30 AM Minutes status: Final  
Meeting location: Assembly Room, 10th Floor or register for remote attendance at http://bit.ly/3lGtgzg
Published agenda: Agenda Agenda Published minutes: Minutes Minutes Meeting Extra1: Not available  
Meeting video:  
Attachments:
File #Ver.Agenda #NameTypeTitleActionResultAction DetailsVideo
23-0347 18.1Committee action approving the Public Works and Transportation Committee minutes from February 1, 2023.minutesCommittee action approving the Public Works and Transportation Committee minutes from February 1, 2023.approval of minutesPass Action details Not available
23-0301 18.2Joint resolution appropriating $1,522,600 of Motor Fuel Tax funds for ice control salt materials needed for the 2023-2024 winter season.resolutionJoint resolution appropriating $1,522,600 of Motor Fuel Tax funds for ice control salt materials needed for the 2023-2024 winter season.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
23-0307 18.3Resolution authorizing the execution of a master agreement with the Village of Barrington regarding the energy, maintenance, and future costs of traffic control devices and interconnection with Lake County PASSAGE.resolutionResolution authorizing the execution of a master agreement with the Village of Barrington regarding the energy, maintenance, and future costs of traffic control devices and interconnection with Lake County PASSAGE.recommended for adoption to the regular agendaPass Action details Not available
23-0310 18.4Joint resolution authorizing a contract with Plead Energy, LLC of Rocky River, Ohio in the amount of $156,060 annually for dry bulk storage tank maintenance and repair services.resolutionJoint resolution authorizing a contract with Plead Energy, LLC of Rocky River, Ohio in the amount of $156,060 annually for dry bulk storage tank maintenance and repair services.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
23-0008 18.5Director’s Report - Public Works.communication or reportDirector’s Report - Public Works.   Action details Not available
23-0299 18.6Joint resolution authorizing a contract with McGinty Bros., Inc., Long Grove, Illinois, in the amount of $82,933 for ecological restoration management of wetland and upland buffer areas requiring native landscape maintenance.resolutionJoint resolution authorizing a contract with McGinty Bros., Inc., Long Grove, Illinois, in the amount of $82,933 for ecological restoration management of wetland and upland buffer areas requiring native landscape maintenance.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
23-0300 18.7Committee action to approve the Spring 2023 Adopt-A-Highway Program.committee action itemCommittee action to approve the Spring 2023 Adopt-A-Highway Program.approvedPass Action details Not available
23-0302 18.8Joint resolution authorizing a contract with Rausch Infrastructure, LLC, Des Plaines, Illinois, in the amount of $1,695,915.56 for the replacement of the Stearns School Road at Mill Creek triple barrel culverts with a single span bridge structure, approprresolutionJoint resolution authorizing a contract with Rausch Infrastructure, LLC, Des Plaines, Illinois, in the amount of $1,695,915.56 for the replacement of the Stearns School Road at Mill Creek triple barrel culverts with a single span bridge structure, appropriating $2,035,000 of County Option Motor Fuel Tax funds.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
23-0304 18.9Joint resolution authorizing a contract with Payne & Dolan, Inc., Antioch, Illinois, in the amount of $4,556,954.58 for the intersection improvement of Wadsworth Road and Kilbourne Road, the resurfacing of Kilbourne Road, from Wadsworth Road to Illinois RresolutionJoint resolution authorizing a contract with Payne & Dolan, Inc., Antioch, Illinois, in the amount of $4,556,954.58 for the intersection improvement of Wadsworth Road and Kilbourne Road, the resurfacing of Kilbourne Road, from Wadsworth Road to Illinois Route 173, and appropriating $5,470,000 of County Option Motor Fuel Tax funds.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
23-0303 18.10Joint resolution appropriating a supplemental amount of $186,000 of ¼% Sales Tax for Transportation funds and approving Change Order Number Three in the amount of $185,803 for additions to the Phase II engineering services contract for the intersection imresolutionJoint resolution appropriating a supplemental amount of $186,000 of ¼% Sales Tax for Transportation funds and approving Change Order Number Three in the amount of $185,803 for additions to the Phase II engineering services contract for the intersection improvement of Wadsworth Road at Lewis Avenue.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
23-0308 18.11Joint resolution authorizing an agreement with Civiltech Engineering, Inc., Itasca, Illinois, to provide Phase II professional engineering services for new traffic signal installations at the intersections of Sunset Avenue at Northern Avenue in Waukegan,resolutionJoint resolution authorizing an agreement with Civiltech Engineering, Inc., Itasca, Illinois, to provide Phase II professional engineering services for new traffic signal installations at the intersections of Sunset Avenue at Northern Avenue in Waukegan, and Deerfield Parkway at Barclay Boulevard in Buffalo Grove, at a maximum cost of $314,756.73 and appropriating $380,000 of Matching Tax funds.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
23-0305 18.12Joint resolution authorizing an agreement with HDR Engineering, Inc., Rosemont, Illinois, for Phase I professional engineering services for improvements along Fairfield Road, from Illinois Route 134 to Gilmer Road, at a maximum cost of $2,549,227 and apprresolutionJoint resolution authorizing an agreement with HDR Engineering, Inc., Rosemont, Illinois, for Phase I professional engineering services for improvements along Fairfield Road, from Illinois Route 134 to Gilmer Road, at a maximum cost of $2,549,227 and appropriating $3,060,000 of the County Option Motor Fuel Tax funds.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
23-0306 18.13Joint resolution authorizing an agreement with Christopher B. Burke Engineering, Rosemont, Illinois, for professional engineering services to evaluate the feasibility of grade separating Peterson Road and Monaville Road at the Canadian National Railroad,resolutionJoint resolution authorizing an agreement with Christopher B. Burke Engineering, Rosemont, Illinois, for professional engineering services to evaluate the feasibility of grade separating Peterson Road and Monaville Road at the Canadian National Railroad, including improvements to Peterson Road, from US Route 45 to Butterfield Road, at a maximum cost of $1,123,215 and appropriating $1,350,000 of County Option Motor Fuel Tax funds.approved and referred on to the Financial and Administrative CommitteePass Action details Not available
23-0009 18.14Director’s Report – Division of Transportation.communication or reportDirector’s Report - Division of Transportation.   Action details Not available