Lake County, IL
File #: 11-0993    Version: 1 Name: Washington Street, Cemetery Road to west of Six Flags Drive, Widening and Reconstruction, Phase III Supplemental Consultant Agreement
Type: resolution Status: Passed
File created: 9/29/2011 In control: Public Works and Transportation Committee
On agenda: Final action: 10/11/2011
Title: Joint resolution authorizing the execution of a supplemental agreement between Lake County and Ciorba Group, Inc., Chicago, Illinois, for the provision of phase III construction engineering for the widening and reconstruction of Washington Street from Cemetery Road to west of Six Flags Drive at a maximum cost for services described of $10,999.45 and designated as Section 02-00110-12-WR.
Attachments: 1. 11-0993 Washington Street Cemetery Rd to Six Flags Drive Supplemental Consultant Agreement Attachment.pdf
Title
Joint resolution authorizing the execution of a supplemental agreement between Lake County and Ciorba Group, Inc., Chicago, Illinois, for the provision of phase III construction engineering for the widening and reconstruction of Washington Street from Cemetery Road to west of Six Flags Drive at a maximum cost for services described of $10,999.45 and designated as Section 02-00110-12-WR.

Staff Summary
· Washington Street, Cemetery Road to west of Six Flags Drive, Widening and Reconstruction, Phase III Supplemental Consultant Agreement.
· The County has been allocated federal STU/HPS funds for this improvement.
· It is necessary to expand phase III construction engineering services to provide for redesigning retaining walls to avoid utility conflicts not anticipated in the original design.
· This resolution authorizes the execution of a supplemental agreement with Ciorba Group, Inc.
Body
R E S O L U T I O N

WHEREAS, Washington Street, County Highway 45, is a designated route on the county highway system; and

WHEREAS, the free flow of traffic along Washington Street is beneficial to the safety and welfare to the State of Illinois and the county as a whole; and

WHEREAS, the State of Illinois and Lake County believe it would be beneficial to the safety and welfare of the motoring public if Washington Street from Cemetery Road to West of Six Flags Drive could be improved by widening and reconstruction; and

WHEREAS, this Lake County Board, at its meeting of August 11, 2009, authorized the execution of a Phase III construction engineering agreement with Ciorba Group, Inc., Chicago, Illinois, for said Phase III engineering services and appropriated $690,000 of Matching Tax funds to provide for these engineering services; and

WHEREAS, it is necessary to expand Phase III engineering services to provide for redesigning retaining walls to avoid utility conflicts not anticipated in the original design at a cost of $10,999.45; and

NOW, THEREFORE BE IT RESOLVE...

Click here for full text