Lake County, IL
File #: 11-0803    Version: 1 Name: Bonner Road at US Rte 12, Traffic Signal Improvement: Appropriation and IDOT Agreement
Type: resolution Status: Consent Agenda
File created: 7/28/2011 In control: Public Works and Transportation Committee
On agenda: Final action: 8/9/2011
Title: Joint resolution authorizing the execution of an agreement between the State of Illinois and Lake County for the improvements to the traffic control signals and turn lane widening at the intersection of Bonner Road at US Rte 12. This resolution appropriates $40,000 of Motor Fuel Tax funds for this improvement designated as Section 11-00140-07-TL.
Attachments: 1. 11-0803 Bonner Road Traffic Signal Improvement Attachment.pdf

Title

Joint resolution authorizing the execution of an agreement between the State of Illinois and Lake County for the improvements to the traffic control signals and turn lane widening at the intersection of Bonner Road at US Rte 12. This resolution

appropriates $40,000 of Motor Fuel Tax funds for this improvement designated as Section 11-00140-07-TL.

 

Staff Summary

                     Bonner Road at US Rte 12, Traffic Signal Improvement: Appropriation and IDOT Agreement

                     The State of Illinois proposes to utilize Federal Highway funds to improve the existing traffic control signals and widen turn lanes at Bonner Road at US Rte 12.

                     The County’s portion of this improvement is for the local match.

                     This resolution authorizes the execution of an agreement with the State of Illinois for this improvement and appropriates $40,000 of Motor Fuel Tax funds.

 

Body

R E S O L U T I O N

 

WHEREAS, Bonner Road, County Highway 61, is a designated route on the county highway system; and

                     

WHEREAS, the State of Illinois proposes to improve the intersection of Bonner Road at US Rte 12, by modernization of the existing traffic control signals and turn lane widening the roadway; and

 

WHEREAS, the State of Illinois will utilize Federal Highway funding for this improvement; and

 

WHEREAS, the county portion of said improvement is for the local share of one leg of this intersection; and

 

WHEREAS, the State of Illinois and Lake County are desirous of entering into an agreement for said improvement; a draft copy of which is attached hereto.

 

NOW, THEREFORE BE IT RESOLVED by this Lake County Board, that the County Board Chair, the County Clerk, and the County Engineer of Lake County are authorized and they are directed to execute on behalf of Lake County an agreement for the improvement at the intersection of Bonner Road at US Rte 12 and such authorization shall include any subsequent amendments.

 

BE IT FURTHER RESOLVED that the County Engineer shall transmit, in writing, the final agreement, and any subsequent amendments, to be executed by the County Board Chair and the County Clerk and grant plan and specification approval to the Illinois Department of Transportation.

 

BE IT FURTHER RESOLVED that there is hereby appropriated $40,000 of Motor Fuel Tax funds for this improvement designated as Section 11-00140-07-TL.

 

BE IT FURTHER RESOLVED that a copy of this agreement, when executed in its final form, be submitted to the Illinois Department of Transportation for their approval and final processing.

 

BE IT FURTHER RESOLVED that this appropriation be processed by the County Engineer for final approval of the Illinois Department of Transportation in accordance with the “Agreement of Understanding” between the Illinois Department of Transportation and Lake County, dated January 22, 2003.

 

DATED at Waukegan, Illinois, on August 9, 2011.