Title
Joint resolution authorizing the execution of a supplemental appropriation of $65,000 and a supplemental agreement between Lake County and AMEC Environment & Infrastructure, Chicago, Illinois, for the provision of additional Phase II professional engineering services for Everett Road at the I-94 Tollway bridge for deck repair and resurfacing, and Deerfield Road at the I-94 Tollway bridge for expansion joint inspection and repair at a supplemental cost of services described of $53,161 and designated as Section 10-00123-06-RS.
Staff Summary
· Everett Road and Deerfield Road at I-94 Tollway: Supplemental Consultant Phase II Agreement and Supplemental Appropriation
· The selected firm of AMEC Environment & Infrastructure, Chicago, Illinois, is proceeding with the Phase II engineering services.
· Additional engineering is necessitated to address out-of-scope elements for Everett Road and the addition of expansion joint inspection and repair plans for Deerfield Road.
· This resolution authorizes the execution of a supplemental agreement with AMEC Environment & Infrastructure, Chicago, Illinois, at a cost of $53,161.
· This resolution appropriates $65,000 of County Bridge Tax funds for these services.
Body
R E S O L U T I O N
WHEREAS, Everett Road, County Highway 52, and Deerfield Road, County Highway 11, are designated routes on the county highway system; and
WHEREAS, the Everett Road bridge over the I-94 Tollway is in need of repair and resurfacing; and
WHEREAS, the Deerfield Road bridge over the I-94 Tollway requires expansion joint inspection and a recommendation for repairs; and
WHEREAS, Phase II, design engineering, is underway for the Everett Road bridge over the I-94 Tollway; and
WHEREAS, the Phase II, design engineering, needs to be completed for the Deerfield Road bridge over the I-94 Tollway; and
WHEREAS, this Lake County Board at its meeting of November 16, 2010, authorized the execution of a professional engineering agreement with AMEC...
Click here for full text