Lake County, IL
File #: 11-0778    Version: 1 Name: Loop Road - Libertyville Campus: Contract Award
Type: resolution Status: Consent Agenda
File created: 7/25/2011 In control: Public Works and Transportation Committee
On agenda: Final action: 8/9/2011
Title: Joint resolution authorizing a contract for the construction of a two lane road on the Libertyville campus, from the existing county fuel facility to the Central Permit Facility, to Campanella & Sons, Wadsworth, Illinois, in the amount of $1,163,970.55 and designated as Section 11-00214-21-MG.
Attachments: 1. 11-0778 Bid Tabulation Loop Road, Libertyville Campus.pdf
Title
Joint resolution authorizing a contract for the construction of a two lane road on the Libertyville campus, from the existing county fuel facility to the Central Permit Facility, to Campanella & Sons, Wadsworth, Illinois, in the amount of $1,163,970.55 and designated as Section 11-00214-21-MG.
 
Staff Summary
·      Loop Road - Libertyville Campus: Contract Award.
·      A new road will be constructed on the Libertyville campus from the existing county fuel facility to the Central Permits Facility.
·      A total of 8-bids were received and the lowest responsible bidder is Campanella & Sons, Wadsworth, Illinois, in the amount of $1,163,970.55.
·      The construction of the new road will be funded from the County Capital Improvement Program in the amount of $1,300,000.
 
Body
R E S O L U T I O N
 
WHEREAS, pursuant to authority granted by this Lake County Board, the County Engineer heretofore called for sealed bids, by publication, for the construction of a two lane road on the Libertyville campus, from the existing county fuel facility to the Central Permits Facility, and designated as Section 11-00214-21-MG; and
 
WHEREAS, pursuant to said publication and calling for said bids, sealed bids were received and opened on July 26, 2011, at 10:00 AM at the Lake County Division of Transportation in Libertyville, Illinois; a tabulation of said bids being as follows:
 
Campanella & Sons, Inc
Wadsworth, IL
$1,163,970.55
 
Lake County Grading
Libertyville, IL
$1,289,197
 
Berger Excavating Contractors, Inc
Wauconda, IL
$1,328,361.68
 
 
Curran Contracting
Lake Bluff, IL
$1,342,676.05
 
Maneval Construction
Grayslake, IL
$1,721,373.24
 
Lenny Hoffman Excavating, Inc
Wilmette, IL
$1,810,351.64
 
Copenhaver Construction Co.
Gilberts, IL
$2,039,301
 
A Lamp Concrete Contractors, Inc
Schaumburg, IL
$2,410,119.50
 
WHEREAS, the Public Works and Transportation Committee, the County Engineer and the Purchasing Agent have examined each bid, and it appears that the lowest responsible bidder is Campanella & Sons, Wadsworth, Illinois, their bid being $1,163,970.55 based on estimated quantities and unit prices; and
 
WHEREAS, the 2011 County Capital Improvement budget includes $1,300,000 for this improvement in line item 101-1103040-85020-000-000-000-1160 and designated as Section 11-00214-21-MG.
 
NOW, THEREFORE BE IT RESOLVED by this Lake County Board that a contract be awarded to said Campanella & Sons, Wadsworth, Illinois, in accordance with their bid of $1,163,970.55 based on estimated quantities and unit prices and that the Purchasing Agent, the County Clerk, and the County Engineer of Lake County be authorized and they are hereby directed to enter into a contract with said low bidder for the construction of a two lane road on the Libertyville campus, from the existing county fuel facility to the Central Permits Facility, and designated as Section 11-00214-21-MG; and
 
BE IT FURTHER RESOLVED that in as much as such estimated quantities are the best approximation that can be determined at this time, these quantities may be added to, deducted from, or modified from in the final determination of the contract cost in accordance with Chapter 605 of the Illinois Compiled Statutes, Act 5, Section 5-205.2 without further Board action, providing the final cost chargeable to the funds appropriated does not exceed the appropriation.
 
DATED at Waukegan, Illinois, on August 9, 2011.