Lake County, IL
File #: 11-0585    Version: 1 Name: Peterson Road at IL Rte 60: IDOT Agreement
Type: resolution Status: Passed
File created: 6/6/2011 In control: Public Works and Transportation Committee
On agenda: Final action: 6/14/2011
Title: Joint resolution authorizing the execution of an agreement for the use of federal highway funds between the State of Illinois and Lake County for the Peterson Road at IL Rte 60 right-of-way and construction cost, designated as Section No. 00-00098-11-CH.
Attachments: 1. 11-0585 Peterson Road at IL Rte 60, IDOT Agreement..pdf
Title
Joint resolution authorizing the execution of an agreement for the use of federal highway funds between the State of Illinois and Lake County for the Peterson Road at IL Rte 60 right-of-way and construction cost, designated as Section No. 00-00098-11-CH.

Staff Summary
· Peterson Road at IL Rte 60: IDOT Agreement.
· The County has been allocated federal funds to improve this intersection and IDOT administers all federal highway funds.
· This resolution authorizes the execution of an agreement with IDOT to provide the County with a maximum reimbursement of $2,500,000 for the costs of right-of-way and construction cost.

Body
R E S O L U T I O N
WHEREAS, Peterson Road, County Highway 20, is a designated route on the county highway system; and

WHEREAS, the free flow of traffic at the intersection of Peterson Road and IL Route 60 is beneficial to the safety and welfare of the State of Illinois and the county as a whole; and

WHEREAS, the State of Illinois and Lake County believe it would be beneficial for the safety and welfare of the motoring public if the intersection of Peterson Road and IL Route 60 could be relocated; and

WHEREAS, the State of Illinois and Lake County are desirous of entering into an agreement to utilize state highway funds for a portion of the cost of the improvement of the relocation of Peterson Road at IL Rte 60, a draft copy of which is attached hereto; and

WHEREAS, the Illinois Department of Transportation, IDOT, will reimburse the County up to a maximum of $2,500,000 for right-of-way and construction costs associated with the IL Rte 60 portion of the improvement.

NOW, THEREFORE BE IT RESOLVED, by this Lake County Board, that the County Board Chair, the County Clerk, and the County Engineer of Lake County are authorized and they are directed to execute an agreement pertaining to the relocation of Peterson Road at IL Rte 60, with a maximum reimbursement of $2,500,000 for the cost of right-of-way and construction cost and such a...

Click here for full text