Lake County, IL
File #: 10-1118    Version: 1 Name: Prairie Crossing Bike Path (IL Rte. 176 to Peterson Road), Phase I Engineering Services: LCDOT Change Order No. 1
Type: committee action item Status: Passed
File created: 11/1/2010 In control: Public Works and Transportation Committee
On agenda: Final action: 11/8/2010
Title: Joint committee action item approving Change Order No. 1 consisting of an increase of $15,069.42 for additions to the Phase I Engineering services for Prairie Crossing Bike Path from IL Rte. 176 to Peterson Road, designated as Section 09-00171-13-BT.
Attachments: 1. Prairie Crossing Bike Path LCDOT Change Order No. 1
Title
Joint committee action item approving Change Order No. 1 consisting of an increase of $15,069.42 for additions to the Phase I Engineering services for Prairie Crossing Bike Path from IL Rte. 176 to Peterson Road, designated as Section 09-00171-13-BT.
 
Staff Summary
·      Prairie Crossing Bike Path (IL Rte. 176 to Peterson Road), Phase I Engineering Services:  LCDOT Change Order No. 1
·      Change Orders need to be approved by the standing committees for cumulative net increases over 10%.
·      The Prairie Crossing Bike Path project is under contract with McClure Engineering, Associates, Inc., in the amount of $73,787.97.
·      Additional engineering services are being required for several revisions to the original scope of work as detailed in the attached Change Order No. 1.
·      Original awarded contract - $73,787.97; Change Order No. 1 - $15,069.60; sum of all changes - $88,857.39.
 
Body