Lake County, IL
File #: 23-0590    Version: 1 Name: Joint resolution authorizing an agreement with Civiltech Engineering, Inc., Itasca, Illinois, to provide Phase II professional engineering services for resurfacing and non-motorized improvements along Prairie Road, from Aptakisic Road to Illinois Route 22
Type: resolution Status: Passed
File created: 4/11/2023 In control: Public Works and Transportation Committee
On agenda: Final action: 5/9/2023
Title: Joint resolution authorizing an agreement with Civiltech Engineering, Inc., Itasca, Illinois, to provide Phase II professional engineering services for resurfacing and non-motorized improvements along Prairie Road, from Aptakisic Road to Illinois Route 22, and for non-motorized improvements along Aptakisic Road, between Buffalo Grove Road and Prairie Road, at a maximum cost of $746,584.76 and appropriating $896,000 of 1/4% Sales Tax for Transportation Funds.
Attachments: 1. 23-0590 Prairie Road Ph II Consultant Agreement Draft, 2. 23-0590 Prairie Road and Aptakisic Road Improvements, 3. 23-0590 Vendor Disclosure -Civiltech - Prairie

Title

Joint resolution authorizing an agreement with Civiltech Engineering, Inc., Itasca, Illinois, to provide Phase II professional engineering services for resurfacing and non-motorized improvements along Prairie Road, from Aptakisic Road to Illinois Route 22, and for non-motorized improvements along Aptakisic Road, between Buffalo Grove Road and Prairie Road, at a maximum cost of $746,584.76 and appropriating $896,000 of ¼% Sales Tax for Transportation Funds.

 

Staff Summary

                     Lake County selects professional engineering firms in accordance with the Local Government Professional Services Selection Act, 50 ILCS 510/1 et. seq.

                     The Lake County Division of Transportation’s Consultant Selection Process has been approved by the Federal Highway Administration and the Illinois Department of Transportation, and the firm selected for this project was selected in accordance with this approved process.

                     The selected firm has a satisfactory past relationship with the Lake County Division of Transportation.

                     This project is included in the Transportation Improvement Program and is designated as Section 23-00999-98-CH.

 

Body

RESOLUTION

 

WHEREAS, Prairie Road, County Highway 59, and Aptakisic Road, County Highway 33, are designated routes on the County highway system; and

 

WHEREAS, Lake County believes it would be beneficial to the safety and welfare of the traveling public if resurfacing and non-motorized improvements could be performed on Prairie Road, from Aptakisic Road to Illinois Route 22, and if non-motorized improvements could be performed along Aptakisic Road, from Buffalo Grove Road to Prairie Road; and

 

WHEREAS, Phase II professional engineering services are required for these improvements; and

 

WHEREAS, it is recommended that a consultant firm be employed to provide these Phase II professional engineering services; and

 

WHEREAS, Lake County, by and through its Division of Transportation, has selected a professional engineering services firm in accordance with the Local Government Professional Services Selection Act, 50 ILCS 510/1 et. seq.; and

 

WHEREAS, Civiltech Engineering, Inc., Itasca, Illinois, are consulting engineers skilled in the provision of these Phase II professional engineering services; and

 

WHEREAS, an appropriation of funds is required.

 

NOW, THEREFORE, BE IT RESOLVED, by this County Board of Lake County, Illinois, that the County Board Chair, the County Clerk, and the County Engineer of Lake County are authorized, and hereby directed to execute on behalf of Lake County, an agreement, and any amendments, between Lake County and Civiltech Engineering, Inc., Itasca, Illinois, at a maximum amount of $746,584.76, for Phase II professional engineering services for resurfacing and non-motorized improvements along Prairie Road, from Aptakisic Road to Illinois Route 22, and for non-motorized improvements along Aptakisic Road, from Buffalo Grove Road to Prairie Road, a draft copy of which is attached hereto.

 

BE IT FURTHER RESOLVED, that the County Engineer shall transmit, in writing, the final agreement and any amendments, to be executed by the County Board Chair and the County Clerk.

 

BE IT FURTHER RESOLVED, that there is hereby appropriated $896,000 of ¼% Sales Tax for Transportation funds for these Phase II professional engineering services, and is designated as Section 23-00999-98-CH.

 

BE IT FURTHER RESOLVED, that this agreement be administered in accordance with Chapter 605, Act 5, Section 5-205.2 of the Illinois Compiled Statutes without further Board action, providing the final contract cost chargeable under the funds appropriated does not exceed the appropriation.

 

DATED at Waukegan, Illinois, on May 9, 2023.