Lake County, IL
File #: 23-0590    Version: 1 Name: Joint resolution authorizing an agreement with Civiltech Engineering, Inc., Itasca, Illinois, to provide Phase II professional engineering services for resurfacing and non-motorized improvements along Prairie Road, from Aptakisic Road to Illinois Route 22
Type: resolution Status: Passed
File created: 4/11/2023 In control: Public Works and Transportation Committee
On agenda: Final action: 5/9/2023
Title: Joint resolution authorizing an agreement with Civiltech Engineering, Inc., Itasca, Illinois, to provide Phase II professional engineering services for resurfacing and non-motorized improvements along Prairie Road, from Aptakisic Road to Illinois Route 22, and for non-motorized improvements along Aptakisic Road, between Buffalo Grove Road and Prairie Road, at a maximum cost of $746,584.76 and appropriating $896,000 of 1/4% Sales Tax for Transportation Funds.
Attachments: 1. 23-0590 Prairie Road Ph II Consultant Agreement Draft, 2. 23-0590 Prairie Road and Aptakisic Road Improvements, 3. 23-0590 Vendor Disclosure -Civiltech - Prairie
Title
Joint resolution authorizing an agreement with Civiltech Engineering, Inc., Itasca, Illinois, to provide Phase II professional engineering services for resurfacing and non-motorized improvements along Prairie Road, from Aptakisic Road to Illinois Route 22, and for non-motorized improvements along Aptakisic Road, between Buffalo Grove Road and Prairie Road, at a maximum cost of $746,584.76 and appropriating $896,000 of 1/4% Sales Tax for Transportation Funds.

Staff Summary
* Lake County selects professional engineering firms in accordance with the Local Government Professional Services Selection Act, 50 ILCS 510/1 et. seq.
* The Lake County Division of Transportation's Consultant Selection Process has been approved by the Federal Highway Administration and the Illinois Department of Transportation, and the firm selected for this project was selected in accordance with this approved process.
* The selected firm has a satisfactory past relationship with the Lake County Division of Transportation.
* This project is included in the Transportation Improvement Program and is designated as Section 23-00999-98-CH.

Body
RESOLUTION

WHEREAS, Prairie Road, County Highway 59, and Aptakisic Road, County Highway 33, are designated routes on the County highway system; and

WHEREAS, Lake County believes it would be beneficial to the safety and welfare of the traveling public if resurfacing and non-motorized improvements could be performed on Prairie Road, from Aptakisic Road to Illinois Route 22, and if non-motorized improvements could be performed along Aptakisic Road, from Buffalo Grove Road to Prairie Road; and

WHEREAS, Phase II professional engineering services are required for these improvements; and

WHEREAS, it is recommended that a consultant firm be employed to provide these Phase II professional engineering services; and

WHEREAS, Lake County, by and through its Division of Transportation, has selected a professional engineering services firm in accordanc...

Click here for full text