Lake County, IL
File #: 23-0161    Version: 1 Name: Washington Street Bike Path: Phase II Consultant Agreement and Appropriation
Type: resolution Status: Passed
File created: 1/20/2023 In control: Public Works and Transportation Committee
On agenda: Final action: 2/21/2023
Title: Joint resolution authorizing an agreement with BLA, Inc., Itasca, Illinois, to provide Phase II professional engineering services for non-motorized travel improvements along Washington Street, between Sextant Drive and Almond Road, at a maximum cost of $417,166 and appropriating $500,000 of 1/4% Sales Tax for Transportation funds.
Attachments: 1. 23-0161 Consultant Agreement, BLA Inc., 2. 23-0161 Location Map, Washington Street Bike Path, 3. 23-0161 Vendor Disclosure, BLA, Inc.
Title
Joint resolution authorizing an agreement with BLA, Inc., Itasca, Illinois, to provide Phase II professional engineering services for non-motorized travel improvements along Washington Street, between Sextant Drive and Almond Road, at a maximum cost of $417,166 and appropriating $500,000 of 1/4% Sales Tax for Transportation funds.

Staff Summary
* BLA, Inc., Itasca, Illinois, will be utilized to complete these Phase II design engineering services for non-motorized improvements on Washington Street. These improvements will install sidewalk between Sextant Drive and Mainsail Drive and a multi-use path between Mainsail Drive and Almond Road.
* Lake County selects professional engineering firms in accordance with the Local Government Professional Services Selection Act, 50 ILCS 510/1 et. seq.
* The Lake County Division of Transportation's (LCDOT) Consultant Selection Process has been approved by the Federal Highway Administration and the Illinois Department of Transportation, and the firm selected for this project was selected in accordance with this approved process.
* LCDOT received and evaluated Statements of Interest and Qualifications from eight professional firms, of which three were short-listed and presented to a consultant selection committee.
* This project is included in the Transportation Improvement Program, and designated as Section 21-00110-15-BT.

Body
RESOLUTION

WHEREAS, Washington Street, County Highway 45, is a designated route on the County highway system; and

WHEREAS, Lake County believes it would be beneficial to the safety and welfare of the traveling public if Washington Street, between Sextant Drive and Almond Road, could be improved by adding non-motorized travel improvements; and

WHEREAS, Phase II professional engineering services are required for these improvements; and

WHEREAS, it is recommended that a consultant engineering firm be employed to provide these Phase II professional engineering services; and

WHEREAS, Lak...

Click here for full text