Lake County, IL
File #: 22-0643    Version: 1 Name: 2022 Concrete Patching: Contract Award and Appropriation
Type: resolution Status: Passed
File created: 4/20/2022 In control: Public Works, Planning & Transportation Committee
On agenda: Final action: 5/10/2022
Title: Joint resolution authorizing a contract with Acura Inc., Bensenville, Illinois, in the amount of $259,314.14 for concrete patching on various County highways, which will be improved under the Illinois Highway Code and appropriating $315,000 of Motor Fuel Tax funds.
Attachments: 1. 22-0643 Bid Tab, Concrete Patching 2022, 2. 22-0643 Justification of Bid, Concrete Patching, 3. 22-0643 Vendor Disclosure, Acura Inc., 4. 22-0643 Location Map, Concrete Patching
Title
Joint resolution authorizing a contract with Acura Inc., Bensenville, Illinois, in the amount of $259,314.14 for concrete patching on various County highways, which will be improved under the Illinois Highway Code and appropriating $315,000 of Motor Fuel Tax funds.

Staff Summary
* Each year the County undertakes patching of its concrete pavements to preserve pavement life and surface quality, including repairing damaged sidewalks, curbs, and gutters.
* This patching and repairing is done on isolated sections of pavements and is included in the Transportation Improvement Program, but not listed individually.
* There was a public call for bids, and a total of three bids were received, ranging from $259,314.14 to $297,163, and the lowest responsible bidder is Acura Inc., Bensenville, Illinois, in the amount of $259,314.14.
* This improvement is designated as Section 22-00000-10-GM.

Body
R E S O L U T I O N

WHEREAS, pursuant to authority granted by this Lake County Board, the County Engineer heretofore called for sealed bids, by publication, for concrete patching on various County highways, and designated as Section 22-00000-10-GM; and

WHEREAS, pursuant to said publication and calling for said bids, sealed bids were received and opened on April 12, 2022, at 10:00 a.m. at the Lake County Division of Transportation in Libertyville, Illinois; a tabulation of said bids being as follows:

Acura Inc.
Bensenville, Illinois
$259,314.14

Triggi Construction, Inc.
West Chicago, Illinois
$275,965

Alliance Contractors, Inc.
Woodstock, Illinois
$297,163

WHEREAS, the Public Works, Planning and Transportation Committee, the County Engineer and the Purchasing Agent have examined each bid, and it appears that the lowest responsible bidder is Acura Inc., Bensenville, Illinois, their bid being $259,314.14 based on estimated quantities and unit prices; and

WHEREAS, an appropriation of funds is required.

NOW, THEREFORE BE IT RESOLVED by this Lake County Board, that a c...

Click here for full text