Lake County, IL
File #: 21-1072    Version: 1 Name: 2021 Concrete Patching: Contract Award and Appropriation
Type: resolution Status: Passed
File created: 7/15/2021 In control: Public Works, Planning & Transportation Committee
On agenda: Final action: 8/10/2021
Title: Joint resolution authorizing a contract with Acura Inc., Bensenville, Illinois, in the amount of $110,887 for concrete patching on various County highways, which will be improved under the Illinois Highway Code and appropriating $135,000 of Motor Fuel Tax funds.
Attachments: 1. 21-1072 Bid Tab, 2021 Concrete Patching, 2. 21-1072 Vendor Disclosure, Acura, 3. 21-1072 Location Map, 2021 Concrete Patching
Title
Joint resolution authorizing a contract with Acura Inc., Bensenville, Illinois, in the amount of $110,887 for concrete patching on various County highways, which will be improved under the Illinois Highway Code and appropriating $135,000 of Motor Fuel Tax funds.

Staff Summary
* Each year the County undertakes patching of its concrete pavements to preserve pavement life and surface quality, including repairing damaged sidewalk, curbs, and gutters.
* This patching and repairing is done on isolated sections of pavements and is included in the Transportation Improvement Program, but not listed individually.
* There was a public call for bids, and a total of four bids were received, ranging from $110,887 to $214,923, and the lowest responsible bidder is Acura Inc., Bensenville, Illinois, in the amount of $110,887.
* This improvement is designated as Section 21-00000-10-GM.

Body
R E S O L U T I O N

WHEREAS, pursuant to authority granted by this Lake County Board, the County Engineer heretofore called for sealed bids, by publication, for concrete patching on various County highways, and designated as section 21-00000-10-GM; and

WHEREAS, pursuant to said publication and calling for said bids, sealed bids were received and opened on July 13, 2021, at 10:00 a.m. at the Lake County Division of Transportation in Libertyville, Illinois; a tabulation of said bids being as follows:

Acura Inc.
Bensenville, Illinois
$110,887

Alliance Contractors, Inc.
Woodstock, Illinois
$138,257

Landmark Contractors, Inc.
Huntley, Illinois
$143,866.05

A Lamp Concrete Contractors, Inc.
Schaumburg, Illinois
$214,923

WHEREAS, the Public Works, Planning and Transportation Committee, the County Engineer and the Purchasing Agent have examined each bid, and it appears that the lowest responsible bidder is Acura Inc., Bensenville, Illinois, their bid being $110,887 based on estimated quantities and unit prices; and

WHEREAS, an appropriation of funds is required.

NOW, THEREFORE BE ...

Click here for full text