Title
Joint resolution authorizing an agreement with Hampton, Lenzini and Renwick, Inc., Elgin, Illinois, at a cost of $162,525, for Phase I preliminary engineering and Phase II design engineering services to replace two culverts crossing on Stearns School Road at Mill Creek, and appropriating $195,000 of County Bridge Tax funds.
Staff Summary
* Two culverts on Stearns School Road at Mill Creek need replacement.
* A consulting engineering firm will be utilized to provide Phase I preliminary engineering and Phase II design engineering services for this improvement.
* Lake County selects professional engineering firms in accordance with the Local Government Professional Services Selection Act, 50 ILCS 510/1 et. Seq.
* The Lake County Division of Transportation's Consultant Selection Process has been approved by the Federal Highway Administration and the Illinois Department of Transportation, and the firm selected for this project was selected in accordance with this approved process.
* The selected firm has a satisfactory past relationship with the Lake County Division of Transportation.
* This project is included in the Transportation Improvement Program, and designated as Section 20-00235-02-BR.
Body
R E S O L U T I O N
WHEREAS, Stearns School Road, County Highway 74, is a designated route on the County highway system; and
WHEREAS, Lake County believes it would be beneficial to the safety and welfare of the traveling public if two culverts on Stearns School Road at Mill Creek could be replaced; and
WHEREAS, it is recommended that a professional engineering services firm be employed to provide Phase I preliminary engineering and Phase II design engineering services; and
WHEREAS, Lake County, by and through its Division of Transportation, has selected a professional engineering services firm in accordance with the Local Government Professional Services Selection Act (50 ILCS 510/1 et. seq.); and
WHEREAS, Hampton, Lenzini, and Renwick, Elgin, Illinois, ...
Click here for full text