File #: 20-0990    Version: 1 Name: Joint resolution authorizing execution of a contract with Joel Kennedy Construction Corp., of Chicago, Illinois in the amount of $923,250 for the Midland Force Main Replacement Phase 1A Project.
Type: resolution Status: Passed
File created: 7/20/2020 In control: Public Works, Planning & Transportation Committee
On agenda: Final action: 8/11/2020
Title: Joint resolution authorizing a contract with Joel Kennedy Construction Corp., Chicago, Illinois, in the amount of $898,250 for the Midland Force Main Replacement Phase 1A Project.
Attachments: 1. 20-0990 Midland Force Main Phase 1A Location Map.pdf, 2. 20-0990 Midland Force Main Phase 1A Bids Tab.pdf, 3. 20-0990 Midland Force Main Phase 1A Vender Disclosure Statement.pdf, 4. 20-0990 Midland Force Main Phase 1A Final Bid Document.pdf, 5. 20-0990 Award Information.pdf

Title

Joint resolution authorizing a contract with Joel Kennedy Construction Corp., Chicago, Illinois, in the amount of $898,250 for the Midland Force Main Replacement Phase 1A Project.

 

Staff Summary

                     The Midland Main Force Main is a 7,300-foot-long 10-inch diameter asbestos cement pipe originally constructed in 1973. Repeated breaks of the pipe at various locations have driven the decision to replace the entire length of the existing pipe in phases over the next two years.

                     This project will include the installation of 4,300 lineal feet of new pipe, one air release valve vault including an auger under Cedar Lake Road to extend the service life of this force main system.

                     The County received bids from four contractors for this work ranging from $923,250 to $1,428,850. Award of this contract is recommended to the lowest responsive responsible bidder, Joel Kennedy Construction Corp., in the amount of $898,250.

                     This resolution authorizes and directs the County Purchasing Agent to execute a contract with Joel Kennedy Construction Corp., in the amount of $898,250.

 

Body

R E S O L U T I O N

 

WHEREAS, the County of Lake (County) owns, operates and maintains force main systems throughout the County including the Midland Force Main in the Northwest Lake Facilities Planning area; and

 

WHEREAS, the Midland Force Main pipe system has been in continuous service since 1973, and recent breaks requiring extensive repairs have identified sections of the pipe that have significant deterioration; and

 

WHEREAS, pipe rehabilitation was considered and was found to be infeasible, and replacement of the pipe is the best solution to extend the service life of the system; and

 

WHEREAS, in accordance with the Lake County Purchasing Ordinance, bids were called for by publication for the Midland Force Main Replacement Phase 1A Project; and

 

WHEREAS, subsequent to said publication, invitations to bid were extended to ten (10) contractors; and

 

WHEREAS, four sealed bids were received and publicly opened via a zoom meeting in the office of the Purchasing Department on Monday, July 13, 2020, at 11:00 a.m.; and

 

WHEREAS, Joel Kennedy Construction Corp., Chicago, IL is the lowest responsive, responsible bidder in the amount of $923,250; three other bids were received ranging in amounts from $973,300 to $1,428,850.

 

NOW, THEREFORE, BE IT RESOLVED, by this County Board of Lake County, Illinois, that the Purchasing Agent is hereby authorized and directed to execute a contract with, Joel Kennedy Construction Corp., in the amount of $898,250 for the Midland Force Main Replace Phase 1A Project.

 

DATED at Waukegan, Lake County, Illinois, on this 11th day of August, 2020.