Lake County, IL
File #: 20-0034    Version: 1 Name: Joint resolution authorizing an agreement with RHMG Engineers, Inc. of Mundelein, Illinois, in the amount of $262,779.00 for final engineering design services for a new Vernon Hills Water System Reservoir.
Type: resolution Status: Passed
File created: 12/23/2019 In control: Public Works, Planning & Transportation Committee
On agenda: Final action: 1/14/2020
Title: Joint resolution authorizing an agreement with RHMG Engineers, Inc., Mundelein, Illinois, in the amount of $262,779 for final engineering design services for a new Vernon Hills Water System Reservoir.
Attachments: 1. 20-0034 RHMG Vendor Disclosure Statement.pdf, 2. 20.0034 RHMG VH Reservoir Final Engineering Agreement PW2017.010.pdf
Title
Joint resolution authorizing an agreement with RHMG Engineers, Inc., Mundelein, Illinois, in the amount of $262,779 for final engineering design services for a new Vernon Hills Water System Reservoir.

Staff Summary
* The Vernon Hills Water System serves approximately 25,000 residents in the Village of Vernon Hills and surrounding areas and requires additional storage capacity to protect users in the event of increased water demand or emergency circumstances.
* RHMG Engineers, Inc. conducted conceptual analysis and aided in site selection, and a 2,000,000-gallon water reservoir will be designed at 50 American Way, Vernon Hills, Illinois.
* The original contract was awarded through a full and open competition. The current award is in accordance with the prior relationship provisions of the Local Government Professional Services Selection Act, 50 ILCS 510/1 et. Seq.

Body
R E S O L U T I O N

WHEREAS, the County of Lake owns, operates and maintains several water systems throughout the County including the Vernon Hills Water System; and

WHEREAS, the Vernon Hills water system serves residents of the Village of Vernon Hills and surrounding areas, serving a total population of more than 25,000 people; and

WHEREAS, the Vernon Hills water system requires additional storage capacity to protect system users in the event of increased water demand or emergency circumstances; and

WHEREAS, due to the specialized nature of this project, the County requires design related services from an engineering firm qualified in this type of engineering; and

WHEREAS, Lake County has a prior satisfactory relationship with RHMG Engineers, Inc. of Mundelein, Illinois in accordance with the Purchasing Ordinance and the Local Government Professional Services Selection Act; and

WHEREAS, an Agreement has been negotiated with RHMG Engineers, Inc. of Mundelein, Illinois to provide the necessary professional engineering design services; and

WHEREAS, these services are in ...

Click here for full text