Lake County, IL
File #: 19-0503    Version: 1 Name: Hart Road at US Route 14: Phase III Consultant Agreement
Type: resolution Status: Passed
File created: 3/20/2019 In control: Public Works, Planning & Transportation Committee
On agenda: Final action: 4/9/2019
Title: Joint resolution authorizing the execution of an agreement with Howard R. (HR) Green, Inc., McHenry, Illinois, for Phase III construction engineering services for the widening and reconstruction of Hart Road at United States (US) Route 14, at a maximum cost of $777,425.28.
Attachments: 1. 19-0503 Hart Road at US 14 Consultant Agreement, HR Green, 2. 19-0503 Hart at 14 Consultant Vendor Disclosure HR Green
Title
Joint resolution authorizing the execution of an agreement with Howard R. (HR) Green, Inc., McHenry, Illinois, for Phase III construction engineering services for the widening and reconstruction of Hart Road at United States (US) Route 14, at a maximum cost of $777,425.28.

Staff Summary
* Lake County selects professional engineering firms in accordance with the Local Government Professional Services Selection Act, 50 ILCS 510/1 et. Seq.
* The Lake County Division of Transportation's (LCDOT) Consultant Selection Process has been approved by the Federal Highway Administration and the Illinois Department of Transportation, and the firm selected for this project was selected in accordance with this approved process.
* Phase III construction engineering services are required to utilize federal highway funds for the Hart Road at US Route 14 widening and reconstruction.
* LCDOT received and evaluated Statements of Qualification from seven professional firms, of which three where short-listed and presented to a consultant selection committee.
* The selected, and recommended, firm is HR Green, Inc. with a maximum cost of $777,425.28.
* This improvement is included in the Highway Improvement Plan, with construction starting in late 2019 or early 2020, and designated as Section 09-00174-05-CH.

Body
R E S O L U T I O N

WHEREAS, Hart Road, County Highway 53, is a designated route on the County highway system; and

WHEREAS, the free flow of traffic at the intersection of Hart Road at US Route 14 is beneficial to the safety and welfare of the State of Illinois and the County as a whole; and

WHEREAS, the State of Illinois and Lake County believe it would be beneficial to the safety and welfare of the motoring public if Hart Road at US Route 14 could be improved by widening and reconstruction, and designated as Section 09-00174-05-CH; and

WHEREAS, Phase III construction engineering services are required for the Hart Road at US Route 14 widening and reconstruction...

Click here for full text