Lake County, IL
File #: 18-1408    Version: 1 Name: 14th St. (IL 131 to Jackson St.): City of Waukegan Agreement
Type: resolution Status: Passed
File created: 10/30/2018 In control: Public Works and Transportation Committee
On agenda: Final action: 11/13/2018
Title: Joint resolution authorizing an agreement with the City of Waukegan for the reconstruction of 14th Street, from Illinois Route 131/Green Bay Road to Sheridan Road, the jurisdictional transfer of the portion of 14th Street within the municipal limits of the City of Waukegan, from Illinois Route 131/Green Bay Road to Victoria Avenue, from the City of Waukegan to Lake County, and designated as Section 99-00260-01-WR.
Attachments: 1. 18-1408 14th St (IL 131 to Sheridan) Waukegan Agreement draft
Title
Joint resolution authorizing an agreement with the City of Waukegan for the reconstruction of 14th Street, from Illinois Route 131/Green Bay Road to Sheridan Road, the jurisdictional transfer of the portion of 14th Street within the municipal limits of the City of Waukegan, from Illinois Route 131/Green Bay Road to Victoria Avenue, from the City of Waukegan to Lake County, and designated as Section 99-00260-01-WR.

Staff Summary
* 14th Street will be reconstructed and improved from, Illinois Route 131/Green Bay Road to Sheridan Road.
* This improvement will include reconstruction of the road to three lanes with a shared center turn lane, a new bike path and sidewalk, street lighting, drainage improvements, and installation of a roundabout at 14th Street and Dugdale which will replace the existing four-way stop.
* The City of Waukegan owns a watermain and sanitary sewer within the project limits that requires modification, and desires that the County install a sidewalk, a multi-use path and street lighting as part of the improvement.
* The City of Waukegan will reimburse Lake County for the engineering and construction costs associated with this work, estimated to be $155,666.61.
* Jurisdiction of the portion of 14th Street, within the municipal limits of Waukegan, from Illinois Route 131/Green Bay Road to Victoria Avenue (just east of Jackson Street), will be transferred from the City of Waukegan to Lake County.

Body
R E S O L U T I O N

WHEREAS, to ensure the free flow of traffic and the safety and welfare of the motoring public, Lake County is desirous of reconstructing and improving 14th Street, from Illinois Route 131/Green Bay Road to Sheridan Road; and

WHEREAS, the City of Waukegan owns a watermain and sanitary sewer within the project limits requiring modification; and

WHEREAS, the City of Waukegan desires that the County include, as part of the improvement, the construction of a sidewalk, a multi-use path and installation of street lighti...

Click here for full text