Title: Joint resolution authorizing a contract with Copenhaver Construction, Inc., Gilberts, Illinois, (Copenhaver Construction) in the amount of $191,697 for the restoration of the drainage channel on the south side of Washington Street, west of I94, and designated as Section 16-00110-14-DR.
Attachments: 1. 18-0749 Bid Tab, Washington Street West Channel Restoration.pdf
Title
Joint resolution authorizing a contract with Copenhaver Construction, Inc., Gilberts, Illinois, (Copenhaver Construction) in the amount of $191,697 for the restoration of the drainage channel on the south side of Washington Street, west of I94, and designated as Section 16-00110-14-DR.

Staff Summary
* A total of six bids were received, ranging from $191,697 to $657,840, and the lowest responsible bidder is Copenhaver Construction in the amount of $191,697.
* This improvement is included in the HHhighway improvement program.

Body
R E S O L U T I O N

WHEREAS, pursuant to authority granted by this Lake County Board, the County Engineer heretofore called for sealed bids, by publication, for the restoration of the drainage channel on the south side of Washington Street, west of I94; and

WHEREAS, pursuant to said publication calling for said bid, sealed bids were received and opened on June 19, 2018, at 10:00 a.m. at the Lake County Division of Transportation in Libertyville, Illinois; a tabulation of said bids being as follows:

Copenhaver Construction, Inc.
Gilberts, Illinois
$191,697

V3 Construction Group, Ltd.
Woodridge, Illinois
$199,895

Campanella and Sons, Inc.
Wadsworth, Illinois
$200,395.70

Kovolic Construction Company, Inc.
Franklin Park, Illinois
$308,640

Alliance Contractors, Inc.
Woodstock, Illinois
$327,129.60

Berger Excavating Contractors, Inc.
Wauconda, Illinois
$657,840

WHEREAS, the Public Works and Transportation Committee, the County Engineer and the Purchasing Agent have examined each bid, and it appears that the lowest responsible bidder is Copenhaver Construction, Inc., Gilberts, Illinois, their bid being $191,697 based on estimated quantities and unit prices; and

WHEREAS, this Lake County Board, by prior resolution at its meeting of November 14, 2017, appropriated $390,000 of County Bridge Tax funds for the restoration of the drainage channel on the south side of Washington Street, west of I94.

NOW, THEREFORE BE IT RESOLVED ...