Lake County, IL
File #: 18-0488    Version: 1 Name: Hunt Club Road at Washington Street: Phase I Consultant Contract
Type: resolution Status: Passed
File created: 4/23/2018 In control: Public Works and Transportation Committee
On agenda: Final action: 5/8/2018
Title: Joint resolution authorizing an agreement with Baxter and Woodman, Inc., Crystal Lake, Illinois, for Phase I preliminary engineering services for the intersection improvement of Hunt Club Road at Washington Street, in an amount of $813,623.16 appropriating $980,000 of 1/4% Sales Tax for Transportation funds, and designated as Section 17-00095-19-CH.
Attachments: 1. 18-0488 Hunt Club Road at Washington Street Consultant Agreement Draft.pdf
Title
Joint resolution authorizing an agreement with Baxter and Woodman, Inc., Crystal Lake, Illinois, for Phase I preliminary engineering services for the intersection improvement of Hunt Club Road at Washington Street, in an amount of $813,623.16 appropriating $980,000 of 1/4% Sales Tax for Transportation funds, and designated as Section 17-00095-19-CH.

Staff Summary
* This project involves Phase I engineering and environmental studies for the intersection improvement of Hunt Club Road at Washington Street and non-motorized travel accommodations (sidewalk and multi-use path).
* A consultant will be utilized to undertake Phase I preliminary engineering services.
* In accordance with the Local Government Professional Services Selection Act, the recommended firm is Baxter and Woodman, Inc., Crystal Lake, Illinois, in the amount of $813,623.16.
* This project is included in the highway improvement program.

Body
R E S O L U T I O N

WHEREAS, Hunt Club Road, County Highway 29, and Washington Street, County Highway 45, are designated routes on the County highway system; and

WHEREAS, Lake County believes it would be beneficial to the safety and welfare of the motoring public if the intersection of Hunt Club Road at Washington Street could be improved; and

WHEREAS, Phase I preliminary engineering services are required for said project; and

WHEREAS, it is advisable that a consultant engineering firm be employed to provide said Phase I preliminary engineering services; and

WHEREAS, Lake County, by and through its Division of Transportation, has selected a professional engineering services firm in accordance with the Local Government Professional Services Selection Act, 50 ILCS 510/1 et. seq.; and

WHEREAS, Baxter and Woodman, Inc., Crystal Lake, Illinois, are consulting engineers skilled in the provision of said Phase I preliminary engineering services; and

WHEREAS, an appropriation of funds is required.

NOW, THEREFORE BE IT RESOLVED by this Lake County ...

Click here for full text