File #: 18-0384    Version: 1 Name: Warren Township Road District: Contract Award
Type: resolution Status: Passed
File created: 3/26/2018 In control: Public Works and Transportation Committee
On agenda: Final action: 4/10/2018
Title: Joint resolution authorizing a contract with Peter Baker and Son Company, Lake Bluff, Illinois, in the amount of $148,271.12 for the Hot-Mix Asphalt (HMA) surface removal, Class D patching and constructing leveling binder and surface courses on Bridle Trail Road, from Hunt Club Road north/northwest to Stearns School Road in the Warren Township Road District, which will be improved under the Illinois Highway Code for a total of 0.95 miles, and designated as Section 18-14102-00-GM.
Attachments: 1. Bid Tab, Warren Road District 2018 Contract Award.pdf

Title

Joint resolution authorizing a contract with Peter Baker and Son Company, Lake Bluff, Illinois, in the amount of $148,271.12 for the Hot-Mix Asphalt (HMA) surface removal, Class D patching and constructing leveling binder and surface courses on Bridle Trail Road, from Hunt Club Road north/northwest to Stearns School Road in the Warren Township Road District, which will be improved under the Illinois Highway Code for a total of 0.95 miles, and designated as Section 18-14102-00-GM.

 

Staff Summary

                     A total of three bids were received, ranging from $148,271.12 to $196,665.47, and the lowest responsible bidder is Peter Baker and Son Company, Lake Bluff, Illinois, in the amount of $148,271.12.

 

Body

R E S O L U T I O N

 

WHEREAS, pursuant to authority granted by this Lake County Board and the Warren Township Road District Highway Commissioner, the County Engineer heretofore called for sealed bids, by publication, for the HMA surface removal, Class D patching and constructing Leveling Binder and Surface Courses on Bridle Trail Road, from Hunt Club Road north/northwest to Stearns School Road in the Warren Township Road District, which will be improved under the Illinois Highway Code for a total of 0.95 miles, and designated as Section 18-14102-00-GM; and

 

WHEREAS, pursuant to said publication and calling for said bids, sealed bids were received and opened on March 20, 2018, at 10:00 A.M. at the Lake County Division of Transportation in Libertyville, Illinois; a tabulation of said bids being as follows:

 

Peter Baker and Son Company

Lake Bluff, Illinois

$148,271.12

 

Payne and Dolan, Inc.

Antioch, Illinois

$163,708.17

 

J. A. Johnson Paving Company

Arlington Heights, Illinois

$196,665.47

 

WHEREAS, the Public Works and Transportation Committee, the County Engineer and the Purchasing Agent have examined each bid, and it appears that the lowest responsible bidder is Peter Baker and Son Company, Lake Bluff, Illinois, their bid being $148,271.12, based on estimated quantities and unit prices.

 

NOW, THEREFORE BE IT RESOLVED by this Lake County Board, that a contract be awarded to said Peter Baker and Son Company, Lake Bluff, Illinois, in accordance with their bid of $148,271.12 based on estimated quantities and unit prices, and that the Purchasing Agent, the County Clerk, and the County Engineer of Lake County be authorized and they are hereby directed to enter into a contract with said low bidder for  the HMA surface removal, Class D patching and constructing Leveling Binder and Surface Courses on Bridle Trail Road, from Hunt Club Road north/northwest to Stearns School Road in the Warren Township Road District, which will be improved under the Illinois Highway Code for a total of 0.95 miles, and designated as Section 18-14102-00-GM.

 

BE IT FURTHER RESOLVED that in as much as such estimated quantities are the best approximation that can be determined at this time, these quantities may be added to, deducted from, or modified from in the final determination of the contract cost in accordance with Chapter 605 of the Illinois Compiled Statutes, Act 5, Section 5-205.2 and Section 6-701.1 without further Board action.

 

BE IT FURTHER RESOLVED that this award be processed by the County Engineer for final approval of the Illinois Department of Transportation in accordance with the “Agreement of Understanding” between the Illinois Department of Transportation and Lake County, dated January 18, 2013, and subject to the approval of the Warren Township Road District Highway Commissioner.

 

DATED at Waukegan, Illinois, on April 10, 2018.