Lake County, IL
File #: 18-0381    Version: 1 Name: Cuba Township Road District: Contract Award
Type: resolution Status: Passed
File created: 3/26/2018 In control: Public Works and Transportation Committee
On agenda: Final action: 4/10/2018
Title: Joint resolution authorizing a contract with Peter Baker and Son Company, Lake Bluff, Illinois, in the amount of $69,585.83 for the construction of leveling binder and surface courses on an existing milled surface on East Oakwood Drive, from North Oak Ridge Road to West Timberlake Road in Cuba Township Road District, which will be improved under the Illinois Highway Code for a total of 0.58 miles and designated as Section 18-04106-00-GM.
Attachments: 1. Bid Tab, Cuba Road District 2018 Contract Award.pdf
Title
Joint resolution authorizing a contract with Peter Baker and Son Company, Lake Bluff, Illinois, in the amount of $69,585.83 for the construction of leveling binder and surface courses on an existing milled surface on East Oakwood Drive, from North Oak Ridge Road to West Timberlake Road in Cuba Township Road District, which will be improved under the Illinois Highway Code for a total of 0.58 miles and designated as Section 18-04106-00-GM.

Staff Summary
* A total of five bids were received, ranging from $69,585.83 to $94,890, and the lowest responsible bidder is Peter Baker and Son, in the amount of $69,585.83.

Body
R E S O L U T I O N

WHEREAS, pursuant to authority granted by this Lake County Board and the Cuba Township Road District Highway Commissioner, the County Engineer heretofore called for sealed bids, by publication, for the construction of Leveling Binder and Surface Courses on an existing milled surface on East Oakwood Drive, from North Oak Ridge Road to West Timberlake Road in Cuba Township Road District, and designated as Section 18-04106-00-GM; and

WHEREAS, pursuant to said publication and calling for said bids, sealed bids were received and opened on March 20, 2018, at 10:00 A.M. at the Lake County Division of Transportation in Libertyville, Illinois; a tabulation of said bids being as follows:

Peter Baker and Son Company
Lake Bluff, Illinois
$69,585.83

Geske and Sons, Inc.
Crystal Lake, Illinois
$78,939.28

Lorig Construction Company
Des Plaines, Illinois
$91,527.78

Arrow Road Construction Company
Mt. Prospect, Illinois
$91,921.38

J.A. Johnson Paving Company
Arlington Heights, Illinois
$94,890

WHEREAS, the Public Works and Transportation Committee, the County Engineer and the Purchasing Agent have examined each bid, and it appears that the lowest responsible bidder is Peter Baker & Son Company, Lake Bluff, Illinois, their bid being $69,585.83, based on estimated quantities and unit prices.

NOW, THEREFORE BE IT RESOLVED by this L...

Click here for full text