Lake County, IL
File #: 17-0914    Version: 1 Name: 14th Street from Illinois Route 131 to Jackson Street Reconstruction; Right-of-Way Acquisition and Appropriation
Type: resolution Status: Passed
File created: 8/22/2017 In control: Public Works and Transportation Committee
On agenda: Final action: 9/12/2017
Title: Joint resolution appropriating $240,000 of 1/4% Sales Tax for Transportation funds for the acquisition of necessary right-of-way, by agreement or condemnation, and other right-of-way costs associated with the proposed reconstruction of 14th Street, from Illinois Route 131 to Jackson Street, and designated as Section 99-00260-01-WR.
Title
Joint resolution appropriating $240,000 of 1/4% Sales Tax for Transportation funds for the acquisition of necessary right-of-way, by agreement or condemnation, and other right-of-way costs associated with the proposed reconstruction of 14th Street, from Illinois Route 131 to Jackson Street, and designated as Section 99-00260-01-WR.

Staff Summary
* 14th Street, from Illinois Route 131 to Jackson Street Reconstruction: Right-of-Way Acquisition and Appropriation.
* A section of 14th Street will be reconstructed, from Illinois Route 131 to Jackson Street.
* Preliminary plans and specifications for this improvement have been prepared.
* To initiate right-of-way acquisitions, an appropriation of $240,000 of 1/4% Sales Tax for Transportation funds is necessary.

Body
R E S O L U T I O N

WHEREAS, the free flow of traffic along 14th Street is beneficial to the safety and welfare of the State of Illinois and the County as a whole; and

WHEREAS, the City of Waukegan, the City of North Chicago, and Lake County believe it would be beneficial for the safety and welfare of the motoring public if 14th Street, from Illinois Route 131 to Jackson Street, was reconstructed; and

WHEREAS, Lake County, by and through its Division of Transportation, has caused to be prepared preliminary plans and right-of-way plats, said plats identifying right-of-way needs; and

WHEREAS, the right-of-way and associated costs are estimated to be $240,000.

NOW, THEREFORE BE IT RESOLVED by this Lake County Board:

SECTION 1: It is hereby determined that it is necessary, and desirable, that Lake County acquire title to, and possession of, all of the real property within the proposed new right-of-way lines of 14th Street, from Illinois Route 131 to Jackson Street, together with construction and other easements, both temporary and permanent, for said highway, all as outlined in plats of highways made under the direction of Shane Schneider, County Engineer of Lake Cou...

Click here for full text