Lake County, IL
File #: 17-0149    Version: 1 Name: Gilmer Road Retaining Wall Maintenance and Culvert Replacement: Appropriation with Condemnation Authority
Type: resolution Status: Passed
File created: 1/31/2017 In control: Public Works and Transportation Committee
On agenda: Final action: 2/14/2017
Title: Joint resolution appropriating $985,000 of County Bridge Tax funds for the construction and acquisition of necessary right-of-way, by agreement or condemnation, and other right-of-way costs associated with the Gilmer Road retaining wall maintenance and culvert replacement, and designated as Section 14-0000-07-GM.
Title
Joint resolution appropriating $985,000 of County Bridge Tax funds for the construction and acquisition of necessary right-of-way, by agreement or condemnation, and other right-of-way costs associated with the Gilmer Road retaining wall maintenance and culvert replacement, and designated as Section 14-0000-07-GM.

Staff Summary
* Gilmer Road Retaining Wall Maintenance and Culvert Replacement: Appropriation with Condemnation Authority.
* A culvert replacement and retaining wall maintenance are required on Gilmer Road and Sequoia Road and are included in the Highway Improvement Program.
* Preliminary plans and specifications for this improvement have been prepared.
* Before a construction letting and right-of-way acquisitions can proceed, authority for appropriation and condemnation is necessary.
* An appropriation of $985,000 of County Bridge Tax funds is required.

Body
R E S O L U T I O N

WHEREAS, Gilmer Road, County Highway 26, is a designated route on the County highway system; and

WHEREAS, it would be beneficial to the safety and welfare of the motoring public if Gilmer Road would be improved by a culvert replacement and retaining wall maintenance; and

WHEREAS, Lake County, by and through its Division of Transportation, has caused to be prepared preliminary plans and right-of-way plats, said plats identifying right-of-way needs; and

WHEREAS, before a construction letting and right-of-way acquisitions can proceed, authority for appropriation and condemnation is necessary; and

WHEREAS, the construction, right-of-way and associated costs are estimated to be $985,000.

NOW, THEREFORE BE IT RESOLVED by this Lake County Board of Illinois:

SECTION 1: It is hereby determined that it is necessary and desirable that Lake County acquire title to and possession of all of the real property within the proposed new right-of-way lines of Gilmer Road at Sequoia Road, together with construction and other easements, both temporary and permanent for said highw...

Click here for full text