File #: 16-0382    Version: 1 Name: 2016 Warren Township Road District: Contract Award
Type: resolution Status: Passed
File created: 4/19/2016 In control: Public Works and Transportation Committee
On agenda: Final action: 5/10/2016
Title: Joint resolution authorizing a contract with Peter Baker & Son Company, Lake Bluff, Illinois, in the amount of $91,000.29, for the hot-mix surface removal, Class D patching, constructing polymerized leveling binder course, surface course lifts, and concrete curb and gutter removal/replacement on Braewick Road and Salisbury Drive in the Bridlewood Subdivision in Warren Township Road District, and designated as Section 16-14149-01-GM.
Attachments: 1. 16-0382 Bid Tab Warren Township.pdf

Title

Joint resolution authorizing a contract with Peter Baker & Son Company, Lake Bluff, Illinois, in the amount of $91,000.29, for the hot-mix surface removal, Class D patching, constructing polymerized leveling binder course, surface course lifts, and concrete curb and gutter removal/replacement on Braewick Road and Salisbury Drive in the Bridlewood Subdivision in Warren Township Road District, and designated as Section 16-14149-01-GM.

 

Staff Summary

                     2016 Warren Township Road District: Contract Award.

                     A total of five bids were received ranging from $91,000.29 to $129,127.54, with Peter Baker & Son Company, Lake Bluff, Illinois, being the lowest responsible bidder with a contract amount of $91,000.29.

 

Body

R E S O L U T I O N

 

WHEREAS, pursuant to authority granted by this Lake County Board and the Warren Township Road District Highway Commissioner, the County Engineer heretofore called for sealed bids, by publication for the hot-mix surface removal, Class D patching, and constructing polymerized leveling binder course and surface course lifts and concrete curb and gutter removal and replacement on Braewick Road and Salisbury Drive in the Bridlewood Subdivision in Warren Township Road District, and designated as Section 16-14149-01-GM, and

 

WHEREAS, pursuant to said publication and calling for said bids, sealed bids were received and opened on April 12, 2016, at 10:00 A.M. at the Lake County Division of Transportation in Libertyville, Illinois, a tabulation of said bids being as follows:

 

Peter Baker & Son Company

Lake Bluff, Illinois

$91,000.29

 

Payne & Dolan, Inc.

Antioch, Illinois

$104,943.40

 

Schroeder Asphalt Service, Inc.

Huntley, Illinois

$111,890.34

 

Chicagoland Paving, Inc.

Lake Zurich, IL

$111,900.00 Illinois

 

J.A. Johnson Paving Company

Arlington Heights, Illinois

$129,127.54

 

WHEREAS, the Public Works and Transportation Committee, the County Engineer and the Purchasing Agent have examined each bid, and it appears that the lowest responsible bidder is Peter Baker & Son Company, Lake Bluff, Illinois, their bid being $91,000.29, based on estimated quantities and unit prices; and

 

NOW, THEREFORE BE IT RESOLVED by this Lake County Board, that a contract be awarded to said Peter Baker & Son Company, Lake Bluff, Illinois, in accordance with their bid of $91,000.29, based on estimated quantities and unit prices, and that the Purchasing Agent, the County Clerk, and the County Engineer of Lake County be authorized and they are hereby directed to enter into a contract with said low bidder for the hot-mix surface removal, Class D patching, and constructing polymerized leveling binder course and surface course lifts and concrete curb and gutter removal and replacement on Braewick Road and Salisbury Drive in the Bridlewood Subdivision in Warren Township Road District, and designated as Section 16-14149-01-GM.

 

BE IT FURTHER RESOLVED that in as much as such estimated quantities are the best approximation that can be determined at this time, these quantities may be added to, deducted from, or modified from in the final determination of the contract cost in accordance with Chapter 605 of the Illinois Compiled Statutes, Act 5, Section 5-205.2 and Section 6-701.1 without further Board action.

 

BE IT FURTHER RESOLVED that this award be processed by the County Engineer for final approval of the Illinois Department of Transportation in accordance with the “Agreement of Understanding” between the Illinois Department of Transportation and Lake County, dated January 18, 2013, and subject to the approval of the Warren Township Road District Highway Commissioner.

 

DATED at Waukegan, Illinois, on May 10, 2016.