Lake County, IL
File #: 16-0381    Version: 1 Name: 2016 Fremont Township Road District: Contract Award
Type: resolution Status: Passed
File created: 4/19/2016 In control: Public Works and Transportation Committee
On agenda: Final action: 5/10/2016
Title: Joint resolution authorizing a contract with Geske and Sons, Inc., Crystal Lake, Illinois, in the amount of $298,761.72, for hot-mix surface removal, Class D patching and constructing hot-mix asphalt leveling binder and surface course lifts on Chevy Chase Road, from Gilmer Road to the Mundelein village limit, in the Fremont Township Road District, and designated as Section 16-07114-01-GM.
Attachments: 1. 16-0381 Bid Tab Fremont Township.pdf
Title
Joint resolution authorizing a contract with Geske and Sons, Inc., Crystal Lake, Illinois, in the amount of $298,761.72, for hot-mix surface removal, Class D patching and constructing hot-mix asphalt leveling binder and surface course lifts on Chevy Chase Road, from Gilmer Road to the Mundelein village limit, in the Fremont Township Road District, and designated as Section 16-07114-01-GM.

Staff Summary
* 2016 Fremont Township Road District: Contract Award.
* A total of three bids were received ranging from $298,761.72 to $389,846.72, with Geske and Sons, Inc., Crystal Lake, Illinois, being the lowest responsible bidder with a contract amount of $298,761.72.

Body
R E S O L U T I O N

WHEREAS, pursuant to authority granted by this Lake County Board and the Fremont Township Road District Highway Commissioner, the County Engineer heretofore called for sealed bids, by publication, for hot-mix surface removal, Class D patching and constructing hot-mix asphalt leveling binder and surface course lifts on Chevy Chase Road, from Gilmer Road to the Mundelein village limit, in the Fremont Township Road District, and designated as Section 16-07114-01-GM; and

WHEREAS, pursuant to said publication and calling for said bids, sealed bids were received and opened on April 12, 2016, at 10:00 A.M. at the Lake County Division of Transportation in Libertyville, Illinois, a tabulation of said bids being as follows:

Geske and Sons, Inc.
Crystal Lake, Illinois
$298,761.72

Peter Baker & Son Company
Lake Bluff, Illinois
$322,475.92

J.A. Johnson Paving Company
Arlington Heights, Illinois
$389,846.72

WHEREAS, the Public Works and Transportation Committee, the County Engineer and the Purchasing Agent have examined each bid, and it appears that the lowest responsible bidder is Geske and Sons, Inc., Crystal Lake, Illinois, their bid being $298,761.72, based on estimated quantities and unit prices; and

NOW, THEREFORE BE IT RESOLVED by this Lake Count...

Click here for full text