Lake County, IL
File #: 16-0127    Version: 1 Name: 2016 Crack Sealing: Appropriation
Type: resolution Status: Passed
File created: 1/26/2016 In control: Public Works and Transportation Committee
On agenda: Final action: 2/9/2016
Title: Joint resolution appropriating $120,000 of Matching Tax funds to provide for crack sealing of bituminous and concrete pavement, where necessary, on various County highways, and designated as Section 16-00000-04-GM.

Title

Joint resolution appropriating $120,000 of Matching Tax funds to provide for crack sealing of bituminous and concrete pavement, where necessary, on various County highways, and designated as Section 16-00000-04-GM.

 

Staff Summary

                     2016 Crack Sealing: Appropriation.

                     Each year, crack sealing is done to County highways to prevent the intrusion of water and incompressible material into the cracks and to reinforce the adjacent pavement.

                     Before a project letting can be held, an appropriation of $120,000 of Matching Tax funds is necessary.

 

Body

R E S O L U T I O N

 

WHEREAS, in order to preserve the pavement condition of bituminous and concrete pavements on various County highways, the Division of Transportation annually undertakes crack sealing of these pavements; and

 

WHEREAS, a survey of pavement conditions of bituminous and concrete pavements on the County highway system has been completed.

 

WHEREAS, before a construction letting can be held, an appropriation of funds is needed.

 

NOW, THEREFORE BE IT RESOLVED by this Lake County Board, that there is hereby appropriated $120,000 of Matching Tax funds for the 2016 crack sealing of bituminous and concrete pavements, where necessary, on the County highway system, and designated as Section 16-00000-04-GM.

 

DATED at Waukegan, Illinois, on February 9, 2016.