Title
Joint resolution authorizing an agreement with the State of Illinois/Illinois Department of Transportation (IDOT) for the utilization of $1,556,595 in federal highway funds for the Phase I preliminary engineering study of Deerfield Road, County Highway 11, from US Route 45/Illinois Route 21 to Saunders Road/Riverwoods Road, appropriating $2,335,000 of 1/4% Sales Tax for Transportation funds, designated as Section 15-00038-07-WR, and State Job No. P-91-159-16.
Staff Summary
* Deerfield Road, from US Route 45/Illinois Route 21 to Saunders Road/Riverwoods Road, Phase I Preliminary Engineering: IDOT Agreement and Appropriation.
* Deerfield Road, from US Route 45/Illinois Route 21 to Saunders Road/Riverwoods Road, needs to be improved by widening and reconstructing the roadway as well as the addition of non motorized accommodations.
* A Phase I preliminary engineering study is required for these improvements.
* This agreement provides for IDOT to reimburse the County 80 percent of the Phase I preliminary engineering cost.
* This resolution authorizes the execution of an agreement with the State of Illinois for the Phase I preliminary engineering and appropriates $2,335,000 of 1/4% Sales Tax for Transportation funds.
Body
RESOLUTION
WHEREAS, Deerfield Road, from US Route 45/Illinois Route 21 to Saunders Road/Riverwoods Road, needs to be improved by widening and reconstructing the roadway as well as the addition of non-motorized accommodations; and
WHEREAS, the free flow of traffic along Deerfield Road, from US Route 45/Illinois Route 21 to Saunders Road/Riverwoods Road, is beneficial to the safety and welfare of the State of Illinois and the County as a whole; and
WHEREAS, the State of Illinois and Lake County believe it would be beneficial to the safety and welfare of the motoring public to reconstruct, widen and include non-motorized accommodations to Deerfield Road, from US Route 45/Illinois Route 21 to Saunders Road/Riverwoods Roa...
Click here for full text