Lake County, IL
File #: 15-0439    Version: 1 Name: 2015 Concrete Pavement Patching: Contract Award
Type: resolution Status: Passed
File created: 4/22/2015 In control: Public Works and Transportation Committee
On agenda: Final action: 5/12/2015
Title: Joint resolution authorizing a contract with A Lamp Concrete Contractors, Inc., Schaumburg, Illinois, the lowest responsible bidder, in the amount of $104,628.65, for concrete pavement patching, where necessary, on various County highways, and designated as Section 15-00000-10-GM.
Attachments: 1. 15-0439 Bid Tab - 2015 Concrete Patching.pdf, 2. 15-0439 Justification Memo - 2015 Concrete Patching.pdf
Title
Joint resolution authorizing a contract with A Lamp Concrete Contractors, Inc., Schaumburg, Illinois, the lowest responsible bidder, in the amount of $104,628.65, for concrete pavement patching, where necessary, on various County highways, and designated as Section 15-00000-10-GM.

Staff Summary
* 2015 Concrete Pavement Patching: Contract Award.
* Each year, the Division of Transportation undertakes patching of its concrete pavements to preserve surface quality, including repairing damaged manholes, catch basins, curbs and gutters.
* This patching and repair is done on isolated sections of pavements that are not listed in the Five-Year Program for resurfacings/rehabilitation/reconstruction, but have been otherwise identified as needing repair.
* A total of five bids were received, ranging from $104,628.65 to $190,449, and the lowest responsible bidder is A Lamp Concrete Contractors, Inc., Schaumburg, Illinois, in the amount of $104,628.65.

Body
R E S O L U T I O N

WHEREAS, pursuant to authority granted by this Lake County Board, the County Engineer heretofore called for sealed bids, by publication, for the concrete pavement patching, where necessary on various County highways, and designated as Section 15-00000-10-GM; and

WHEREAS, pursuant to said publication calling for said bids, sealed bids were received and opened on April 14, 2015, at 10:00 a.m., at the Lake County Division of Transportation in Libertyville, Illinois, a tabulation of said bids being as follows:

A Lamp Concrete Contractors, Inc.
Schaumburg, Illinois
$104,628.65

Triggi Construction, Inc.
West Chicago, Illinois
$131,205

Alliance Contractors, Inc.
Woodstock, Illinois
$160,829.65

Copenhaver Construction
Gilberts, Illinois
$185,315

Path Construction Company
Arlington Heights, Illinois
$190,449

WHEREAS, the Public Works and Transportation Committee, the County Engineer, and the Purchasing Agent have examined each bid, and it appears that ...

Click here for full text