Lake County, IL
File #: 15-0319    Version: 1 Name: 2015 Pavement Markings for Bituminous and Concrete Pavements: Appropriation
Type: resolution Status: Passed
File created: 3/19/2015 In control: Public Works and Transportation Committee
On agenda: Final action: 4/14/2015
Title: Joint resolution appropriating $860,000 of Motor Fuel Tax funds to provide for the removal, replacement or refurbishment of pavement markings on the bituminous and concrete pavements of various County highways, and designated as Section 15-00000-15-GM.
Title
Joint resolution appropriating $860,000 of Motor Fuel Tax funds to provide for the removal, replacement or refurbishment of pavement markings on the bituminous and concrete pavements of various County highways, and designated as Section 15-00000-15-GM.
 
Staff Summary
·      2015 Pavement Markings for Bituminous and Concrete Pavements: Appropriation.
·      The County has miles of pavement markings for medians, lane lines, and cross walks on bituminous and concrete pavements.
·      These thermoplastic and polyurea markings last longer than paint, but eventually require replacement.
·      This replacement project is in the 2015 program.
·      Before a project letting can be held, an appropriation of $860,000 of Motor Fuel Tax funds is necessary.
 
Body
R E S O L U T I O N
 
WHEREAS, in order to preserve the condition of pavement markings on the County highway system, the Division of Transportation annually undertakes the removal, replacement or refurbishment of the thermoplastic and polyurea markings on the bituminous and concrete pavements of various County highways; and
 
WHEREAS, a survey of the conditions of the above-said pavement markings on bituminous and concrete pavements on the County highway system has been completed.
 
NOW, THEREFORE BE IT RESOLVED by this Lake County Board, that there is hereby appropriated $860,000 of Motor Fuel Tax funds for the 2015 removal, replacement or refurbishment of pavement markings on the bituminous and concrete pavements of various County highways, and designated as Section 15-00000-15-GM.
 
BE IT FURTHER RESOLVED that this appropriation be processed by the County Engineer for final approval of the Illinois Department of Transportation in accordance with the "Agreement of Understanding" between the Illinois Department of Transportation and Lake County, dated January 18, 2013.
 
DATED at Waukegan, Illinois, on April 14, 2015.