Lake County, IL
File #: 15-0200    Version: 1 Name: Joint Resolution authorizing execution of an Agreement with RHMG Engineers, Inc. in the amount of $145,656 for design engineering services for the Route 120 Reservoir Expansion Project
Type: resolution Status: Passed
File created: 2/18/2015 In control: Public Works and Transportation Committee
On agenda: Final action: 3/10/2015
Title: Joint resolution authorizing execution of an agreement with RHMG Engineers, Inc., Mundelein, Illinois, in the amount of $145,656 for design engineering services for the Route 120 Reservoir Expansion Project.
Attachments: 1. 15-0200 Route 120 Reservoir Expansion RHMG Agreement
Title
Joint resolution authorizing execution of an agreement with RHMG Engineers, Inc., Mundelein, Illinois, in the amount of $145,656 for design engineering services for the Route 120 Reservoir Expansion Project.

Staff Summary
* The Route 120 Reservoir, which is a key component of the Wildwood water system, requires additional water storage volume to provide increased reliability and backup in case of loss of water supply from CLCJAWA.
* This project proposes increasing the volume of the cast-in-place concrete reservoir from 750,000 gallons to 1,500,000 gallons.
* In accordance with the Local Government Professional Services Selection Act, the recommended firm is RHMG Engineers, Inc. of Mundelein, Illinois.
* This resolution authorizes execution of a professional services agreement with RHMG Engineers, Inc. of Mundelein, Illinois, in the amount of $145,656.

Body
R E S O L U T I O N

WHEREAS, the County of Lake (County) owns, operates and maintains several water systems which include water mains, pump stations and water storage reservoirs and tanks; and

WHEREAS, the Route 120 reservoir, in the Wildwood water system, is in need of additional storage volume to provide increased reliability and backup should there be a disruption in the CLCJAWA water supply; and

WHEREAS, due to the specialized nature of this project, the County requires design related services from an engineering firm qualified in this type of engineering; and

WHEREAS, RHMG Engineers, Inc. is qualified to provide the specialized design related services for this project in accordance with the Local Government Professional Services Selection Act, 50 ILCS 510/1 et. seq.; and

WHEREAS, execution of an Agreement for Professional Services must be authorized by Resolution of this County Board.

NOW, THEREFORE, BE IT RESOLVED, by this County Board of Lake County, Illinois, that the Purchasing Agent is hereby authorized and directed t...

Click here for full text