Title: Joint resolution appropriating $1,370,000 of Matching Tax funds and $905,000 of Motor Fuel Tax funds for the resurfacing of Rollins Road, from Washington Avenue to Fairfield Road, and designated as Section 14-00080-59-RS.
Title
Joint resolution appropriating $1,370,000 of Matching Tax funds and $905,000 of Motor Fuel Tax funds for the resurfacing of Rollins Road, from Washington Avenue to Fairfield Road, and designated as Section 14-00080-59-RS.

Staff Summary
* Rollins Road Resurfacing: Appropriation.
* Rollins Road, from Washington Avenue to Fairfield Road, is in need of resurfacing.
* This project will include milling 3 3/4 inches and placing a 3 3/4 inch overlay on Rollins Road, from Washington Avenue to Hellendale Avenue, milling 3 inches and placing a 5 inch overlay on Rollins Road, from Wilson Road to Fairfield Road, and constructing hot mix asphalt paved shoulders adjacent to the overlay in areas without curb and gutter sections.
* Rollins Road, from Hellendale Avenue to Wilson Road, was resurfaced in 2014 as part of the drainage improvement and will not be included in this resurfacing project.
* Before a project letting can be held, an appropriation of $1,370,000 of Matching Tax funds and $905,000 of Motor Fuel Tax funds is necessary.

Body
R E S O L U T I O N

WHEREAS, Rollins Road, County Highway 31, is a designated route on the County highway system; and

WHEREAS, it would be beneficial to the safety and welfare of the motoring public if Rollins Road, from Washington Avenue to Hellendale Avenue, could be improved by milling 3 3/4 inches and placing a 3 3/4 inch overlay, and if Rollins Road, from Wilson Road to Fairfield Road, could be improved by milling 3 inches and placing a 5 inch overlay, and constructing hot mix asphalt paved shoulders adjacent to the overlay in areas without curb and gutter sections; and

WHEREAS, plans, specifications and estimates of costs for this improvement have been completed, and this improvement is now ready to proceed to contract letting; and

WHEREAS, before a construction letting can be held, an appropriation of funds is needed.

NOW, THEREFORE BE IT RESOLVED by this Lake County Board, that there is here...