Lake County, IL
File #: 15-0120    Version: 1 Name: 2015 Crack Seal: Appropriation
Type: resolution Status: Passed
File created: 1/28/2015 In control: Public Works and Transportation Committee
On agenda: Final action: 2/10/2015
Title: Joint resolution appropriating $120,000 of Matching Tax funds to provide for crack sealing of bituminous and concrete pavement, where necessary, on various County highways, and designated as Section 15-00000-04-GM.
Title
Joint resolution appropriating $120,000 of Matching Tax funds to provide for crack sealing of bituminous and concrete pavement, where necessary, on various County highways, and designated as Section 15-00000-04-GM.
 
Staff Summary
·      2015 Crack Sealing: Appropriation.
·      Each year, crack sealing is done to County highways to prevent the intrusion of water and incompressible material into the cracks and to reinforce the adjacent pavement.
·      Before a project letting can be held, an appropriation of $120,000 of Matching Tax funds is necessary.
 
Body
R E S O L U T I O N
 
WHEREAS, in order to preserve the pavement condition of bituminous and concrete pavements on various County highways, the Division of Transportation annually undertakes crack sealing of these pavements; and
 
WHEREAS, a survey of pavement conditions of bituminous and concrete pavements on the County highway system has been completed.
 
NOW, THEREFORE BE IT RESOLVED by this Lake County Board, that there is hereby appropriated $120,000 of Matching Tax funds for the 2015 crack sealing of bituminous and concrete pavements, where necessary, on the County highway system, and designated as Section 15-00000-04-GM.
 
DATED at Waukegan, Illinois, on February 10, 2015.