File #: 14-1313    Version: 1 Name: Buffalo Grove Road, Illinois Route 22 to Deerfield Parkway. Phase II: Consultant Agreement and Appropriation
Type: resolution Status: Passed
File created: 12/30/2014 In control: Public Works and Transportation Committee
On agenda: Final action: 1/13/2015
Title: Joint resolution authorizing the execution of an agreement for consulting engineering services with Gewalt Hamilton Associates, Inc., Vernon Hills, Illinois, for Phase II design engineering services for the reconstruction and widening of Buffalo Grove Road, from Illinois Route 22 to Deerfield Parkway, at a maximum cost of $1,197,363.11, appropriating $1,440,000 of 1/4% Sales Tax for Transportation funds, and designated as Section 11-00249-03-WR.
Attachments: 1. 14-1313 Buffalo Grove Road Phase II Consultant Agreement Draft
Title
Joint resolution authorizing the execution of an agreement for consulting engineering services with Gewalt Hamilton Associates, Inc., Vernon Hills, Illinois, for Phase II design engineering services for the reconstruction and widening of Buffalo Grove Road, from Illinois Route 22 to Deerfield Parkway, at a maximum cost of $1,197,363.11, appropriating $1,440,000 of ¼% Sales Tax for Transportation funds, and designated as Section 11-00249-03-WR.
 
Staff Summary
·      Buffalo Grove Road, Illinois Route 22 to Deerfield Parkway, Phase II: Consultant Agreement and Appropriation.
·      Buffalo Grove Road, from Illinois Route 22 to Deerfield Parkway, needs to be reconstructed and widened.
·      A consulting engineering firm will be used for the Phase II design engineering for this improvement.
·      In accordance with the Local Government Professional Services Selection Act, the recommended firm is Gewalt Hamilton Associates, Inc., Vernon Hills, Illinois.
·      This resolution authorizes the execution of a professional services agreement with Gewalt Hamilton Associates, Inc., Vernon Hills, Illinois, at a maximum cost of services described as $1,197,363.11 and appropriates $1,440,000 of ¼% Sales Tax for Transportation funds for this improvement.
 
Body
R E S O L U T I O N
 
WHEREAS, Buffalo Grove Road, County Highway 16, is a designated route on the County highway system; and
 
WHEREAS, it would be beneficial for the safety and welfare of the motoring public if Buffalo Grove Road, from Illinois Route 22 to Deerfield Parkway, could be reconstructed and widened; and
 
WHEREAS, it is advisable that a consultant engineering firm be employed to provide Phase II design engineering services for said improvement; and
 
WHEREAS, Lake County, by and through its Division of Transportation, has selected a professional engineering services firm in accordance with the Local Government Professional Services Selection Act, 50 ILCS 510/1 et. seq.; and
 
WHEREAS, Gewalt Hamilton Associates, Inc., Vernon Hills, Illinois, are consulting engineers skilled in the provision of said Phase II design engineering services; and
 
WHEREAS, an appropriation of funds is required.
 
NOW, THEREFORE BE IT RESOLVED by this Lake County Board, that Gewalt Hamilton Associates, Inc., Vernon Hills, Illinois, be employed to provide said Phase II design engineering services, and that the County Board Chair, the County Clerk and the County Engineer of Lake County are authorized, and they are directed to execute on behalf of Lake County, an agreement, a draft copy of said agreement attached hereto, for consultant engineering services between Lake County and Gewalt Hamilton Associates, Inc., Vernon Hills, Illinois, at a maximum cost of services described as $1,197,363.11.
 
BE IT FURTHER RESOLVED that the County Engineer shall transmit, in writing, the final agreement to be executed by the County Board Chair and the County Clerk.  
 
BE IT FURTHER RESOLVED that there is hereby appropriated $1,440,000 of ¼% Sales Tax for Transportation funds for these engineering services, and designated as Section 11-00249-03-WR.
 
BE IT FURTHER RESOLVED that this agreement be administered in accordance with Chapter 605, Act 5, Section 5-205.2 of the Illinois Compiled Statutes without further Board action providing the final contract cost chargeable under the funds appropriated does not exceed the appropriation.
 
DATED at Waukegan, Illinois, on January 13, 2015.