Lake County, IL
File #: 14-0287    Version: 1 Name: 2014 Fremont Township Road District: Contract Award
Type: resolution Status: Passed
File created: 3/21/2014 In control: Public Works and Transportation Committee
On agenda: Final action: 4/8/2014
Title: Joint resolution authorizing a contract with Peter Baker & Son Company, Lake Bluff, Illinois in the amount of $217,101.78, for Hot-Mix surface removal, Class D patching and constructing Hot-Mix Asphalt leveling binder and Hot-Mix Asphalt surface course lifts on Ivanhoe Road, from Brown Road to 600' west of Fairfield Road, in the Fremont Township Road District, and designated as Section 14-07104-01-GM.
Attachments: 1. 14-0287 2014 Fremont Township Road District
Title
Joint resolution authorizing a contract with Peter Baker & Son Company, Lake Bluff, Illinois in the amount of $217,101.78, for Hot-Mix surface removal, Class D patching and constructing Hot-Mix Asphalt leveling binder and Hot-Mix Asphalt surface course lifts on Ivanhoe Road, from Brown Road to 600' west of Fairfield Road, in the Fremont Township Road District, and designated as Section 14-07104-01-GM.
 
Staff Summary
·      2014 Fremont Township Road District: Contract Award.
·      A total of four bids were received, ranging from $217,101.78 to $268,717.83, with Peter Baker & Son Company, Lake Bluff, Illinois being the lowest responsible bidder with a contract amount of $217,101.78.
 
Body
R E S O L U T I O N
 
WHEREAS, pursuant to authority granted by this Lake County Board and the Fremont Township Road District Highway Commissioner, the County Engineer heretofore called for sealed bids, by publication, for Hot-Mix surface removal, Class D patching and constructing Hot-Mix Asphalt leveling binder and Hot-Mix Asphalt surface course lifts on Ivanhoe Road, from Brown Road to 600' west of Fairfield Road, in the Fremont Township Road District, and designated as Section 14-07104-01-GM; and
 
WHEREAS, pursuant to said publication and calling for said bids, sealed bids were received and opened on March 18, 2014, at 10:00 A.M. at the Lake County Division of Transportation in Libertyville, Illinois, a tabulation of said bids being as follows:
 
Peter Baker & Son Company
Lake Bluff, Illinois
$217,101.78
 
Geske and Sons, Inc.
Crystal Lake, Illinois
$227,451.93
 
Arrow Road Construction Company
Mt. Prospect, Illinois
$259,236
 
J. A., Johnson Paving Company
Arlington Heights, Illinois
$268,717.83
 
WHEREAS, the Public Works and Transportation Committee, the County Engineer and the Purchasing Agent have examined each bid, and it appears that the lowest responsible bidder is Peter Baker & Son Company, Lake Bluff, Illinois, their bid being $217,101.78, based on estimated quantities and unit prices; and
 
NOW, THEREFORE BE IT RESOLVED by this Lake County Board, that a contract be awarded to said Peter Baker & Son Company, Lake Bluff, Illinois, in accordance with their bid of $217,101.78, based on estimated quantities and unit prices, and that the Purchasing Agent, the County Clerk, and the County Engineer of Lake County be authorized and they are hereby directed to enter into a contract with said low bidder for  the Hot-Mix surface removal, Class D patching and constructing Hot-Mix Asphalt leveling binder and Hot-Mix Asphalt surface course lifts on Ivanhoe Road, from Brown Road to 600' west of Fairfield Road, in the Fremont Township Road District, and designated as Section 14-07104-01-GM, to Peter Baker & Son Company, Lake Bluff, Illinois, in the amount of $217,101.78.
 
BE IT FURTHER RESOLVED that in as much as such estimated quantities are the best approximation that can be determined at this time, these quantities may be added to, deducted from, or modified from in the final determination of the contract cost in accordance with Chapter 605 of the Illinois Compiled Statutes, Act 5, Section 5-205.2 and Section 6-701.1 without further Board action.
 
BE IT FURTHER RESOLVED that this award be processed by the County Engineer for final approval of the Illinois Department of Transportation in accordance with the "Agreement of Understanding" between the Illinois Department of Transportation and Lake County, dated January 18, 2013, and subject to the approval of the Fremont Township Road District Highway Commissioner.
 
DATED at Waukegan, Illinois, on April 8, 2014.