Lake County, IL
File #: 12-0085    Version: 1 Name: Wadsworth Road at Green Bay Road Intersection Improvement, Phase II Supplemental: IDOT Agreement.
Type: resolution Status: Passed
File created: 1/25/2012 In control: Public Works and Transportation Committee
On agenda: Final action: 2/14/2012
Title: Joint resolution authorizing the execution of Amendment 1 to the agreement for the use of federal highway funds between the State of Illinois/Illinois Department of Transportation (IDOT) and Lake County for the improvements to Wadsworth Road at Green Bay Road designated as Section 03-00033-12-CH.
Attachments: 1. 12-0085 Wadsworth Road at Green Bay Road Phase II Supplemental IDOT Agreement.pdf
Title
Joint resolution authorizing the execution of Amendment 1 to the agreement for the use of federal highway funds between the State of Illinois/Illinois Department of Transportation (IDOT) and Lake County for the improvements to Wadsworth Road at Green Bay Road designated as Section 03-00033-12-CH.

Staff Summary
· Wadsworth Road at Green Bay Road Intersection Improvement, Phase II Supplemental: IDOT Agreement.
· The County has been allocated federal Congestion Mitigation and Air Quality (CMAQ) funds to widen and reconstruct this section of Wadsworth Road and Green Bay Road and IDOT administers all federal highway funds.
· The Phase II design engineering scope of work is being expanded to provide for redesigning the signals’ interconnect system from wireless to a buried cable system not anticipated in the original design.
· This agreement allows for the County to receive 80% reimbursement for the cost of this Amendment 1.

Body
R E S O L U T I O N

WHEREAS, Wadsworth Road, County Highway 17, is a designated route on the County highway system; and

WHEREAS, it would be beneficial to the safety and welfare of the motoring public if the intersection of Wadsworth Road and IL Route 131 could be improved by widening and resurfacing; and

WHEREAS, this Lake County Board, at its meeting of February 12, 2008, authorized the execution of an agreement to utilize federal highway funds for the above-proposed improvement; and

WHEREAS, this Lake County Board, at its meeting of February 12, 2008, appropriated $600,000 of Motor Fuel Tax funds to provide for the Phase II design engineering services for the above-proposed this improvement; and

WHEREAS, supplemental Phase II design engineering services are necessary for the above-proposed this improvement; and

WHEREAS, the State of Illinois and Lake County are desirous of entering into an Amendment 1 to the agreement to utilize federal highway funds for the above-proposed supplemental Phase II design engineering servic...

Click here for full text