File #: 10-0814    Version: 1 Name: Pulaski Drive Bridge Underdeck Repair: Emergency Contract Award: Confirmation
Type: resolution Status: Passed
File created: 8/26/2010 In control: Public Works and Transportation Committee
On agenda: Final action: 9/14/2010
Title: Joint resolution confirming the acceptance of an emergency contract award to Dunnet Bay Construction, Glendale Heights, IL for underdeck repairs and placing permanent underdeck shielding in some areas of the Pulaski Drive Bridge over US Rte 41 and designated as Section 10-00196-08-BR.
Title
Joint resolution confirming the acceptance of an emergency contract award to Dunnet Bay Construction, Glendale Heights, IL for underdeck repairs and placing permanent underdeck shielding in some areas of the Pulaski Drive Bridge over US Rte 41 and designated as Section 10-00196-08-BR.
Staff Summary
· Pulaski Drive Bridge Underdeck Repair: Emergency Contract Award: Confirmation
· A recent bridge inspection by County engineers showed numerous areas of cracks and spalls on the underside of the bridge. The deck itself is in good structural condition.
· Structural engineers, Bloom Companies, LLC, were hired to determine the extent of delaminated areas on the underside of the bridge, make recommendations on repairs, and provide a cost estimate for the repairs.
· Emergency repairs and the placing of underdeck shielding was recommended.
· The County Engineer certified an emergency procurement and the Purchasing Agent issued a purchase order for the emergency repair work.
· The selected contractor vendor is Dunnet Bay Construction, Glendale Heights, IL with a contract amount of $85,635 and is changed from 08-0196-08-BR to 10-0196-08-BR.
· This resolution, per the Lake County Purchasing Ordinance Sec. 6-103, ratifies the emergency procurement.

Body
R E S O L U T I O N

WHEREAS, Pulaski Drive (County Highway 13) is a designated route on the county highway system; and

WHEREAS, inspections by Lake County engineering staff identified areas of cracks and spalls on the underside of the Pulaski Drive bridge over US Rte 41; and

WHEREAS, Bloom Companies, LLC (structural engineers) was hired to determine the extent of delaminated areas on the underside of the of the Pulaski Drive bridge over US Rte. 41 and make recommendations on repairs and provide a cost estimate for the repairs ; and

WHEREAS, inspections and estimates of costs for this repair are complete; and

WHEREAS, the estimated cost of said underdeck repairs and placing permanent underdeck shielding ...